21 Jan 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
CONSTRUCTION OF P BUND DRAIN NEAR HOUSE OF FAROOQ AHMAD LONE AND MOHAMMAD YOUSUF AT KACHWARI.
2026_RDPR_300508_14
NIT_105_REW BUDGAM OF 2025-26
Open Tender
Civil Works
Percentage
30 days
Khansahib
AS PER ENIT
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹3,715
Yes
13 Jan 2026
13 Jan 2026
22 Jan 2026
13 Jan 2026
21 Jan 2026
13 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Rural Engineering wing Budgam
Name of work :- Construction of P bund drain near house of Farooq Ahmad lone and Mohammad Yousuf at Kachwari. Scheme: DDC
Contract No and date : As per eNIT (F:Y: 2025-26) Adv cost = Rs 0.74250 Lacs
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
0_) Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: BI01010001010000000000000515BI0100001118 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing/Laying Stone soling Nallah/Plum hand packed on level in foundation trenches including carriages of Stones BI01010001010000000000000515BI0100001119 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Two Thousand Four Hundred & Eight and Paise Nine Only
0_) P/L in position cement concrete of 1:3:6 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate (including carriage of all materials) BI01010001010000000000000515BI0100001120 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Forty Two Thousand Eight Hundred & Eighty Seven and Paise Thirty Three Only
0_) Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. BI01010001010000000000000515BI0100001121 Sqm _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Eight Thousand Seven Hundred & Seventy Nine and Paise Forty Nine Only
0_) Applying 12mm thick Cement Plaster in 1:6 mix BI01010001010000000000000515BI0100001122 Sqm _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Six Thousand Five Hundred & Thirty Seven and Paise Twenty Five Only
0_) Carriage of Stone Aggregate by M.T for an average lead of 25kms BI01010001010000000000000515BI0100001123 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Three Thousand One Hundred & Twenty Nine and Paise Forty Five Only
0_) Carriage of Stone Soling by M.T for an average lead of 15kms BI01010001010000000000000515BI0100001124 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR One Thousand &Forty and Paise Eighty Five Only
0_) Carriage of Sand by M.T for an average lead of 30kms BI01010001010000000000000515BI0100001125 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR One Thousand Nine Hundred & Four and Paise Forty Four Only
0_) Add provisions for signboard, Photographes, (Head load to be paid as per actual condition of site )and other unforseen items. BI01010001010000000000000515BI0100001126 No _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Four Thousand Two Hundred & Four Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures INR Seventy Four Thousand Two Hundred & Fifty and Paise Seventy Nine Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_974887.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .