CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-01 Ward-82 ke antargat Sama Parveen ke makan se Saiyad Irfan hote hue Mohd. Hasan ke makan tak gali nali nirman/sudhar karya.
2026_NNAMC_1188760_14
28.09.2026
Open Tender
Civil Works
Percentage
60 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
AS PER DOCS
₹19,766
23 Sept 2026
23 Sept 2026
28 Sept 2026
23 Sept 2026
28 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of existin enchrochment like ramp, platform etc monolethic structure and inding stacking of materials with all complete work | 351 | Sqm | 51 | ₹17,901 |
| 2 | Earth work cutting/Filling of embankment lead 30 m and up to 1.5 m lift with all complete work (S.I.No.253) | 177.66 | cum | 87.3 | ₹15,509.72 |
| 3 | Earth work Exavation in foundation as in wet and foul position lead lift &30 m lead with aqll complete work (S.I.No.251) | 37.35 | cum | 160 | ₹5,976 |
| 4 | PCC 1:6:12 cement sand and 40mm brick ballast and all compelte the work (s.I.No.-273) | 9.96 | Cum | 3,500 | ₹34,860 |
| 5 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) | 29.95 | cum | 5,300 | ₹1,58,735 |
| 6 | Struck Pointing (1:2) cement sand mortor including all complete work (S.I.No.574) | 166 | sqm | 197 | ₹32,702 |
| 7 | Providing&Laying 100 micron polythene with all complition of work | 592.2 | Rmt | 74.88 | ₹44,343.94 |
| 8 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 44.42 | cum | 1,654.8 | ₹73,506.22 |
| 9 | Cement concrete with cement, sand & 20mm gauge stone grit with the proportion of (1:2:4) including all complete the work. | 68.1 | Cum | 8,200 | ₹5,58,420 |
| 10 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) | 1.3 | Cum | 9,300 | ₹12,090 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
Tendernotice_2.pdf
PDF • 1.18 MB
BOQ_2239925.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .