Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | -21.25% | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.8 Cr+₹16.5 L (6.30%)Admitted-Finance | -16.29% | ₹2.8 Cr+₹16.5 L (6.30%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 Cr+₹57.2 L (21.8%)Admitted-Finance | -4.11% | ₹3.2 Cr+₹57.2 L (21.8%) | L3 | Admitted-Finance |
| 4 | L4₹3.3 Cr+₹65.9 L (25.1%)Admitted-Finance | -1.50% | ₹3.3 Cr+₹65.9 L (25.1%) | L4 | Admitted-Finance |
Tender Value
₹3.3 Cr
EMD Value
₹6.7 L
Closing Date
26 May 2026, 3:00 pmClosed
EE,NMD-1,DDA
EE,NMD-1,DDA
Replacement of Grit wash with plaster, restoration of common area including staircase and sanitary work.
2026_DDA_908844_1
08/EE/NMD-I/DDA/2026-27
Open Tender
Civil Works
Works
240 days
Pitampura
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹6.7 L
5 Jun 2026
15 May 2026
27 May 2026
15 May 2026
26 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | - | sqm | 54.2 | - |
| 2 | 12 mm cement plaster
a) 1:4 (1 cement: 4 coarse sand) | - | sqm | 353 | - |
| 3 | 12 mm cement plaster
a) 1:4 (1 cement: 4 fine sand) | - | sqm | 343 | - |
| 4 | Extra for plastering exterior walls of height more than 10 m from ground level for every additional height of 3m or part thereof. | - | sqm | 69.7 | - |
| 5 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge.
Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. | - | sqm | 338.25 | - |
| 6 | a)Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, above 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system
with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge.
Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works | - | sqm | 524.3 | - |
| 7 | Providing and applying white cement based putty of average thickness 1
mm, of approved brand and manufacturer, over the plastered wall surface
to prepare the surface even and smooth complete. | - | sqm | 143.14 | - |
| 8 | Providing, erecting, maintaining and removing temporary protective screens made out of specified fabric with all necessary fixing arrangement to ensure that it remains in position for the work duration as required by the Engineer-in-charge.
Wooven PVC cloth | - | sqm | 49.8 | - |
| 9 | Finishing walls with textured exterior paint of required shade :
New work (Two or more coats applied @ 3.28 ltr/10 sqm)
over and including priming coat of exterior primer applied @ 2.20kg/10 sqm | - | sqm | 223.6 | - |
| 10 | Finishing walls with water proofing cement paint of required shade :
New work (Two or more coats applied @ 3.84 kg/10 sqm) sqm | 1 | sqm | 116.9 | ₹116.78 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
BOQ_955217.xls
BOQ • 0.37 MB
NIT08.pdf
Tender Documents • 1.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .