| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-AOC 39 PRATAPGANJ PETH SATARA TALUKA DISTRICT SATARA | PUNE | MAHARASHTRA | 412206 | ₹12.3 L | L1 | Accepted-AOC As per NIT |
| 2 | L2₹12.4 LRejected-AOC | ₹12.4 L | L2 | Rejected-AOC As per NIT |
| 3 | L3₹13.4 LRejected-AOC | ₹13.4 L | L3 | Rejected-AOC As per NIT |
| 4 | L4₹14.8 LRejected-AOC NOT FOUND | NEW DELHI | DELHI | 110001 | ₹14.8 L | L4 | Rejected-AOC As per NIT |
| 5 | L5₹15.0 LRejected-AOC | ₹15.0 L | L5 | Rejected-AOC As per NIT |
Tender Value
₹16.1 L
EMD Value
₹16,200
Closing Date
26 May 2026, 11:00 amClosed
Executive Engineer MIDC Division Kolhapur
1st Floor MIDC Office Udyog Bhavan Nagala Park Kolhapur
Karad G C Industrial area M and R Road Repair of Low Laying Road Portion In C Block with C C Pavement CD Work etc
2026_MIDC_1301903_1
21 of 2026
Open Tender
Civil Works
Percentage
Karad
Please refer Tender Document
8 documents required · 8 mandatory
₹7,080
₹16,200
21 Jul 2026
11 May 2026
27 May 2026
11 May 2026
26 May 2026
21 May 2026
11 May 2026 - 15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DG Karad ( G.C ) Industrial area ..... M&R Road Repair of Low Laying Road Portion In C Block with C.C Pavement , CD Work etc | |||||
| 0.0 | Picking the road surface including sectioning etc. complete (WBM surface.) | 263 | sqm | 34.1 | ₹8,968.3 |
| 0.0 | Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m.and spreading for embankment or stacking as directed. | 230 | cum | 152.9 | ₹35,167 |
| 0.0 | Excavation for roadway in soft rock, including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading or stacking as directed. | 23 | cum | 194.7 | ₹4,478.1 |
| 0.0 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20 cm to 30 cm.breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97 % of standard Proctor density for a lead of over 50 m.to300 m.inclusive from the site of excavation to the site of deposition as directed. | 32 | cum | 214.5 | ₹6,864 |
| 0.0 | Providing and laying cement concrete pipe of IS 458 : 2003 NP-3 class of 600 mm diameter in proper line, level and slope etc. complete. | 12 | rmt | 5,342.7 | ₹64,112.4 |
| 0.0 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/ Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- Plant Mix Method and Grading - I Material | 68 | cum | 2,579.8 | ₹1,75,426.4 |
| 0.0 | Wet Mix Macadam -- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Laying By Grader/Paver. | 54 | cum | 2,567.95 | ₹1,38,669.3 |
| 0.0 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineer-in-charge , compacting with vibratory roller, finishing, curing and including preparation of sub-grade surface if required etc. complete. with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. | 27 | cum | 4,266.35 | ₹1,15,191.45 |
| 0.0 | Providing and laying 125 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete. | 263 | sqm | 33 | ₹8,679 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_2235431.xls
BOQ • 0.35 MB
TenderDocument.pdf
Tender Documents • 0.41 MB
ItemSpecification.pdf
Other Document • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].