| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC LOWEST ACCEPTED |
| 2 | L2₹2.8 Cr+₹66.2 L (31.1%)Rejected-Finance H NO 859 SANTEMOL RAIA SALCETE GOA | SOUTH GOA | GOA | 403103 | ₹2.8 Cr+₹66.2 L (31.1%) | L2 | Rejected-Finance REJECTED L2 |
| 3 | L3₹3.0 Cr+₹90.6 L (42.5%)Rejected-Finance | ₹3.0 Cr+₹90.6 L (42.5%) | L3 | Rejected-Finance REJECTED L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-GST NOT AS PER REQUIRED FORMET |
Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
17 May 2022, 4:00 pmClosed
EXECUTIVE ENGINEER
SCD EE DIRECTORATE OF AGRICULTURE TONCA GOA
STRENGTHENING TO THE BUND DIGGI KHAZAN DIGUI KHAZAN AT DIGGIWADA NARAO IN BICHOLIM TALUKA.
2022_DAG_3847_1
SCD/D.Agri./2022-23/e14/L2/145
Open Tender
Civil Works
Item Rate
360 days
NARAO BICHOLIM GOA
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹5.4 L
25 Nov 2022
2 May 2022
19 May 2022
2 May 2022
17 May 2022
2 May 2022
Amount
Clearing jungle up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30cm. Measured at a height of 1mt. Above ground level and removal of rubbish upto a distance of 50mt. Outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for item 4001.
Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead.
Earthwork in excavation in all type of strata comprising any of the materials such as soil, sand, clay, gravel, moorum of all varieties, shingles, pebbles, all type of conglamerates, laterite rock, soft rock, ordinary rock, disintegrated rock, fissures/shattered, decomposed rock, and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convient or permitted, inclusive of chiselling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc. includin pumping or bailing out water, including setting out construction of shoring and strutting, removal of stumps and other deleterious matter, dressing of sides of bottom, providing barricading, danger lighting, guarding etc. backfilling the excavated earth to the extent required and disposal of excavated stuff in specified areas with all leads and lifts etc. and as directed by Engineer-in-charge etc. all complete.
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: (a) Upto 2.50 metre long pile.
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: (d) Above 5.00 metres long piles.
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) (a) Upto 2.50 metre long pile.
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured). (d) Above 5.00 metres long piles.
Providing and fixing bamboos of length 6.00 m. or as specified and 4 cms. mean diameter spacing at 0.20 m.c/c for groynes, cofferdam and closure of breaches including cutting into pieces, making into halves longitudinally holding in position, fastening with coir string, nailing as per specifications with all lead and as directed by Engineer-In-Charge etc. complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for (a) Foundation, footings, bases for columns and mass concrete.
Centering and shuttering including struttings, propping and removal of formwork for (xiii) Suspended floors, roofs landings, shelves & their supports
(ii) Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like
Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (Confirming to IS 1786 of 1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
Providing & laying cement concrete 1: 1.5: 3 (1 cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level.
Providing & laying cement concrete 1: 1.5: 3 (1 cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level.
Reinforced cement concrete work (1:11/2:3) (1 cement:11/ 2 coarse sand: 3 graded granitic or basaltic aggreate 20mm nominal size)in suspended floors, roofs, landings, shelves and their supports and balconies upto floor five level including finishing and plastering the ceiling with C.M. (1:3) (1 cement: 3 fine sand) of thickness not exceeding 6mm to give a smooth and even surface but excluding the cost of centering and shuttering
Laterite boulder masonry in cement concrete1:3:6 (1cement, 3 coarse sand:6 graded stone aggregate of 20mm nominal size) in foundation
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Earthwork in Embankment with approved earth (Contractor earth)/moorum including spreading the earth in layers not exceeding 250mm. in depth, breaking clods, rolling each layer with half ton roller or wooden or steel hammer including filling up ground depression, dressing etc. complete with all lead and lift and as directed by Engineer-in-Charge.
18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 ( 1 cement : 5 coarse sand) and top layer 6mm thick with cement plaster 1: 3 (1 cement : 3 coarse sand) finished with sponge.
Providing woodwork in frames of doors, windows, clerestory windows trusses & other frames wrought framed and fixed in positon. (d) Second class matti wood.
Painting 2 coats with oil type wood preservative of approved brand & manufacture on new work.
Shri Sidharth R. Xette Bandekar
Clasic Construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .