Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.6 CrAdmitted-Finance HOUSE NO 91 NEAR HARJAN CHOUPAL BAJGHERA GURUGRAM HARYANA 122017 | GURUGRAM | GURUGRAM | HARYANA | 122017 | -5.09% | ₹6.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.4 Cr+₹87.0 L (13.3%)Admitted-Finance | +7.50% | ₹7.4 Cr+₹87.0 L (13.3%) | L2 | Admitted-Finance |
Tender Value
₹6.9 Cr
EMD Value
₹13.8 L
Closing Date
7 Aug 2026, 3:00 pmClosed
EE,RMD-3,DDA
EE,RMD-3,DDA
Re-carpeting of 20m,28m and 40m R/w Roads including repair Of Footpath and Drains in Sector-23,Rohini.
2026_DDA_920151_1
12/EE/RMD-3/DDA/2026-27
Open Tender
Civil Works
Works
75 days
ROHINI
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹13.8 L
21 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and carrying out Cold Milling of the existing bituminous pavement comprising Bituminous Concrete
(BC), Dense Bituminous Macadam (DBM) or any other asphaltic layer, using a self-propelled, sensor-controlled
cold milling machine equipped with automatic grade and slope control, to remove the existing bituminous layer to a
depth ranging from 25 mm to 100 mm or as directed by the Engineer-in-Charge. The work shall be executed in a
manner that maintains the line, level, longitudinal profile, cross-fall and camber of the underlying pavement without
causing damage or disturbance to the underlying base/sub-base or concrete pavement. The milled surface shall be
left clean, uniform, and suitable for laying subsequent bituminous layers. The item includes: Surveying and marking
of milling limits; Milling of the existing bituminous layer to the specified depth; Collection, loading, transportation
and disposal of surplus milled material (RAP) to the designated location for all leads and lifts, or as directed by the
Engineer-in-Charge; Thorough cleaning of the milled surface using mechanical broom, air compressor or other
approved means; Rectification of localized damages, depressions, loose patches or distress exposed after milling
using approved bituminous materials, wherever required; Maintaining traffic and providing all necessary safety
measures during execution; all labour, machinery, fuel, tools, plants, incidentals and other operations required to
complete the work. The work shall be carried out in accordance with the relevant provisions of MoRTH
Specifications (Latest Revision), IRC:SP:100 (Use of Cold Milling Machine for Asphalt Pavement), IRC:37,
IRC:81 and other applicable IRC guidelines, complete as directed by the Engineer-in-Charge. Note: The Reclaimed
Asphalt Pavement (RAP) generated from cold milling shall become the property of the contractor. The contractor
shall transport, utilize, recycle, or dispose of the RAP material at his own cost. The quoted rate shall be deemed to
include the salvage value of the recovered RAP and no separate payment shall be made for the reclaimed material. | - | cum | 519.5 | - |
| 2 | Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. | - | sqm | 14.05 | - |
| 2.1 | With medium setting bitumen emulsion. | - | - | - | - |
| 2.2 | On bituminous surface @ 0.25kg/sqm. | - | - | - | - |
| 3 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. | - | sqm | 21.2 | - |
| 3.1 | With medium setting bitumen emulsion | - | - | - | - |
| 3.2 | On W.B.M / W.M.M. @ 0.4kg/sqm | - | - | - | - |
| 4 | Providing and laying bituminous macadam using crushed stone aggregate of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. | - | cum | 8,505.65 | - |
| 4.1 | 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.50% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | - | - | - | - |
| 5 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. | - | cum | 12,126.2 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_966961.xls
BOQ • 0.32 MB
NIT12.pdf
Tender Documents • 2.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .