| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-AOC | ₹16.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹16.3 LRejected-AOC | ₹16.3 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | G Sathish Kumar L1 | SAMBASIVAN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.001.Renewal of the Road From Sappadi Road to Kuruppasappadi Road Km 0/0-0/775 H/O Kamandoddi.(R-103).Est.Amt.Rs:-16.35 Lakhs. | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 418.5 | Sqm | 6.35 ₹2,657.48 | 6.38 ₹2,670.03 |
| 3.00 | Advance Patch Work for making up the undulation in the existing B.T surface to an average thickness of 25mm using 13.20mm IRC Size HBG Metal | 0.35 | Cum | 4,686.15 ₹1,640.15 | 4,702.57 ₹1,645.90 |
| 4.00 | Providing and laying Tack coat over BT surface(not treated with primer) using 3Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 2,337 | Sqm | 33.64 ₹78,616.68 | 33.75 ₹78,873.75 |
| 5.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 70.11 | Cum | 11,677.5 ₹8.2 L | 11,718.41 ₹8.2 L |
| 6.00 | Providing HM Stones | 2 | Cum | 779.22 ₹1,558.44 | 781.95 ₹1,563.90 |
| 7.00 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass beads on bituminous Surface | 155 | Sqm | 889.11 ₹1.4 L | 892.23 ₹1.4 L |
| 8.00Construction of Retaining Wall (Sub Estimate) | |||||
| 9.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 26.1 | Cum | 263.52 ₹6,877.87 | 264.44 ₹6,901.88 |
| 10.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 5.22 | Cum | 5,293.87 ₹27,634 | 5,312.42 ₹27,730.83 |
Tender Value
₹16.4 L
EMD Value
₹17,000
Closing Date
25 Nov 2025, 3:00 pmClosed
The Block Developement Officer (V.P) Shoolagiri
The Block Development Office Shoolagiri
Krishnagiri District Shoolagiri Block under the Scheme Mines and Minerals_2023_24 Renewal of the Road From Sappadi Road to Kuruppasappadi Road Km 0/0-0/775 (R-103) in Kamandoddi Panchayat Package No_2025_26_SGI_89
2025_RDTN_625748_1
Rocno_1907_2025_E2
Open Tender
Civil Works - Roads
The Block Development Office Shoolagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹17,000
Yes
The Block Development Office Shoolagiri
16 Mar 2026
22 Nov 2025
25 Nov 2025
22 Nov 2025
25 Nov 2025
22 Nov 2025
24 Nov 2025
Amount
1.Renewal of the Road From Sappadi Road to Kuruppasappadi Road Km 0/0-0/775 H/O Kamandoddi.(R-103).Est.Amt.Rs:-16.35 Lakhs.
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Advance Patch Work for making up the undulation in the existing B.T surface to an average thickness of 25mm using 13.20mm IRC Size HBG Metal
Providing and laying Tack coat over BT surface(not treated with primer) using 3Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing HM Stones
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass beads on bituminous Surface
Construction of Retaining Wall (Sub Estimate)
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Provision For Name Board Charges
Provision For Photocharges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SAMBASIVAN CONTRACTOR (BID ID -1519473)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
PB89.pdf
Tender Documents • 0.75 MB
TB89.pdf
Tender Documents • 0.80 MB
BOQ_748263.xls
BOQ • 0.32 MB