Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.8 LAdmitted-Finance | ₹46.8 L | L1 | Admitted-Finance |
| 2 | L2₹55.4 LAdmitted-Finance | ₹55.4 L | L2 | Admitted-Finance |
| 3 | L3₹60.5 LAdmitted-Finance | ₹60.5 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SUBRAMANYAM CONSTRUCTIONS L3 | V SIVA KUMAR L2 | S P Constructions L1 |
|---|---|---|---|---|---|---|
| 1.00EARTH WORK | ||||||
| 1.10 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 414 | Cum | 400 ₹1.7 L | 250 ₹1.0 L | 300 ₹1.2 L |
| 2.00CEMENT CONCRETE (CAST IN SITU) | ||||||
| 2.10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 56 | Cum | 7,294 ₹4.1 L | 7,000 ₹3.9 L | 7,650 ₹4.3 L |
| 2.20 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 62 | Cum | 6,812 ₹4.2 L | 7,500 ₹4.7 L | 5,250 ₹3.3 L |
| 3.00REINFORCED CEMENT CONCRETE | ||||||
| 3.10 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 180 | Sqm | 500 ₹90,000 | 1,000 ₹1.8 L | 850 ₹1.5 L |
| 3.20 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 18,974 | Kg | 126 ₹23.9 L | 120 ₹22.8 L | 85 ₹16.1 L |
| 3.30 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum | 220 | Cum | 9,504 ₹20.9 L | 7,800 ₹17.2 L | 7,500 ₹16.5 L |
| 4.00STEEL WORK | ||||||
Updated dates
Tender Value
₹64.9 L
EMD Value
₹1.3 L
Closing Date
22 Oct 2025, 3:00 pmClosed
THE DIRECTOR
CSIR - NAL, KODIHALLI, BENGALURU
Construction of the foundation for the Establishing Clean Room (Class 100000) facility for Automated Fiber Placement(AFP) at ACD Kodihalli.
2025_CSIR_251415_1
NAL/14/EBU-KH/2025-26
Open Tender
Civil Works
90 days
CSIR - NATIONAL AEROSPACE LABORATORIES
Please refer tender documents
10 documents required · 10 mandatory
₹1,000
DIRECTOR, CSIR-NAL, BENGALURU
₹1.3 L
18 Dec 2025
7 Oct 2025
23 Oct 2025
7 Oct 2025
22 Oct 2025
7 Oct 2025
stage.html
html • 0.03 MB
techsummary_288597.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tenderdocument.pdf
Tender Documents • 1.37 MB
UndertakingLetter.pdf
Other Document • 0.20 MB
Checklist.pdf
Other Document • 0.31 MB
approvedmaterials.pdf
Other Document • 1.58 MB
AcceptenceLetters.pdf
Other Document • 0.20 MB
BankDetails.pdf
Other Document • 0.19 MB
BOQ_288597.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid