Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹57.0 L Construction of combined building for SINE IRCC and IDC ground plus 7 storeys with basement including finishing works water supply and sanitary installations IEI and cable laying firefighting system automatic fire alarm and PA system lifts HVAC access control and development works at IIT bombay powai mumbai SH providing installation testing and commissioning of integrated building management system. | Construction of combined building for SINE IRCC and IDC ground plus 7 storeys with basement including finishing works water supply and sanitary installations IEI and cable laying firefighting system automatic fire alarm and PA system lifts HVAC access control and development works at IIT bombay powai mumbai SH providing installation testing and commissioning of integrated building management system. | L1 | |
| 2 | L2₹59.6 L+₹2.6 L (4.65%) Construction of combined building for SINE IRCC and IDC ground plus 7 storeys with basement including finishing works water supply and sanitary installations IEI and cable laying firefighting system automatic fire alarm and PA system lifts HVAC access control and development works at IIT bombay powai mumbai SH providing installation testing and commissioning of integrated building management system. | Construction of combined building for SINE IRCC and IDC ground plus 7 storeys with basement including finishing works water supply and sanitary installations IEI and cable laying firefighting system automatic fire alarm and PA system lifts HVAC access control and development works at IIT bombay powai mumbai SH providing installation testing and commissioning of integrated building management system. | L2 |
| Sl No | Description | Qty | Unit | VAV AIRCONDITIONING L2 | TECHNOCRATS SECURITY SYSTEMS PVT LTD L1 |
|---|---|---|---|---|---|
| 1 | Electrical works | - | - | -1 ₹59,60,243.52 | -5.4 ₹56,95,343.81 Lowest |
Tender Value
₹60.2 L
EMD Value
₹1.2 L
Closing Date
27 Apr 2022, 3:00 pmClosed
AE(E)-4
Executive Engineer
Office of EE SM Elect. CGO Bldg 7th Floor Navi Mumbai-400614
Construction of combined building for SINE IRCC and IDC ground plus 7 storeys with basement including finishing works water supply and sanitary installations IEI and cable laying firefighting system automatic fire alarm and PA system lifts HVAC access control and development works at IIT bombay powai mumbai SH providing installation testing and commissioning of integrated building management system.
4511
01/CE cum ED/ EE and SM (E)/IITB/2022-23
OPEN
Electrical Works
NCB
75 days
Mumbai, Maharashtra
1 document required · 1 mandatory
₹1.2 L
Conference hall, DEan IPS office IIT Bombay main building 1st floor
27 Apr 2022
20 Apr 2022
27 Apr 2022
27 Apr 2022
23 Apr 2022
25 Apr 2022
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Draft+NIT+BMS+final+upload.pdf
document • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .