| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹4.1 L+₹23,550 (6.09%)Rejected-AOC | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹4.3 L+₹44,550 (11.5%)Rejected-AOC | L3 | Rejected-AOC L3 bidder |
Tender Value
₹4.6 L
EMD Value
₹5,000
Closing Date
9 Jun 2022, 4:00 pmClosed
SE, ETC I, Lucknow
Preshan Bhawan, Vibhuti Khand, Lucknow
Work of grass cutting and uprooting at various substation under ETD-I, Lucknow
2022_UPTCL_679285_3
e-tender 108/2021-22
Open Tender
Miscellaneous Works
Piece-work
365 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹5,000
6 Aug 2022
23 May 2022
10 Jun 2022
23 May 2022
9 Jun 2022
23 May 2022
Amount
1) Clearance of dense Jungle and Cutting of Grass, Kusha & Kansa including Uprooting of the Rank Vegetation, Grass, Bushes, Shrubs etc. by Scrapping of Grass, Bush Wood & Plants etc. above 2" over the ground level; Weeding out the wild growth Roots, Seeds etc. and collection of the foreign materials like Kankar, Ballast, Pebbles, Waste Papers etc. in Switchyard Area including Area between Pale Fencing & Chain Link Fencing, Area between Pale / Chain Link Fencing & Security Fencing / Security Wall, Area around Control Room / Committee Room / Store Sheds and Openyard Store Area at the Sub Station & surrounding of Sub Station, then Disposal of all the removed Vegetation, Rubbish & Garbage etc. by throwing it outside the Periphery of the Sub Station Premises, as per details below :
a) First Cutting between 20 April 2022 to 20th May 2022
i) 220 kV Substation Hardoi Road
ii) 132 kV Substation TRT
iii) 132 kV Substation Martinpurwa
iv) 132 kV Substation SGPGI
v) 132 kV Substation Mohaan Road
vi) 132 kV Substation Rahimabad.
vii) 400 KV Zehta
b) Second Cutting between 20th September 2022 to 20th Octerber 2022
i) 220 kV Substation Hardoi Road
ii) 132 kV Substation TRT
iii) 132 kV Substation Martinpurwa
iv) 132 kV Substation SGPGI
v) 132 kV Substation Mohaan Road
vi) 132 kV Substation Rahimabad.
vii) 400 KV Zehta
c) Third Cutting between 20th January 2023 to 20th February 2023
i) 220 kV Substation Hardoi Road
ii) 132 kV Substation TRT
iii) 132 kV Substation Martinpurwa
iv) 132 kV Substation SGPGI
v) 132 kV Substation Mohaan Road
vi) 132 kV Substation Rahimabad.
vii) 400 KV Zehta
2) Uprooting of small wild Trees in Switchyard Area including Area Store Sheds and Area near Main Gate at the Sub Station by digging and taking out the complete Root, then disposal of all the removed Vegetation, Rubbish & Garbage etc. by throwing it outside the Periphery of the Sub Station Premises and finally, leveling the ground, with all cost of men, misc. consumables and T&P etc. required for the job, as per details below :
a) First Uprooting between 20 April 2022 to 20th May 2022
i) 220 kV Substation Hardoi Road
ii) 132 kV Substation TRT
iii) 132 kV Substation Martinpurwa
iv) 132 kV Substation SGPGI
v) 132 kV Substation Mohaan Road
vi) 132 kV Substation Rahimabad.
vii) 400 KV Zehta
b) Seond Uprooting between 20th September 2022 to 20th Octerber 2022
i) 220 kV Substation Hardoi Road
ii) 132 kV Substation TRT
iii) 132 kV Substation Martinpurwa
iv) 132 kV Substation SGPGI
v) 132 kV Substation Mohaan Road
vi) 132 kV Substation Rahimabad.
vii) 400 KV Zehta
b) Third Uprooting between 20th January 2023 to 20th February 2023
i) 220 kV Substation Hardoi Road
ii) 132 kV Substation TRT
iii) 132 kV Substation Martinpurwa
iv) 132 kV Substation SGPGI
v) 132 kV Substation Mohaan Road
vi) 132 kV Substation Rahimabad.
vii) 400 KV Zehta
M/S DINESH KUMAR
M/S G.S. Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .