Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Not Qualified |
Tender Value
₹1.1 Cr
EMD Value
₹3.4 L
Closing Date
14 May 2026, 12:00 pmClosed
CHIEF ENGINEER
LDA GOMTI NAGAR LUCKNOW
Gomti Nagar Yojna, Vikalp Khand me Panchsheel Apartment evam Kathota Jheel ke madhya isthit Green Belt ka vikash karya
2026_LDAUP_1139731_1
11/E-NIvida/CE/2026-27_11
Open Tender
Civil Works
Percentage
180 days
LUCKNOW
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,366
SECRATARY LDA
₹3.4 L
1 Jul 2026
21 Apr 2026
15 May 2026
21 Apr 2026
14 May 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil. DSR 2023- 2.8.1 | - | Cum | - | - |
| 2 | supplying and stacking of good earth at site including royalty and carriage up to 15km complete( earth measured in stacks will be reduced by 20% for payment - PSR Supplying and stacking of good earth | - | Cum | - | - |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. DSR 2023- 2.31 | - | Sqm | 1 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). DSR 2023- 4.1.8 | 1 | Cum | 1 | ₹1 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023- 4.1.3 | 1 | Cum | 1 | ₹1 |
| 6 | Mild steel or iron work in plain work such as in R.C.C. or R.B. (when not included in an over all rates ) including bending for proper completion of the work and including supply of steel and its wastage , bends, hooks and authorised overlaps shall be measured up to floor two level - L.D.A APPRO. | 0.4 | Qtl | - | - |
| 7 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. DSR 2023- 10.2 | - | Kg | - | - |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete., Hot finished seamless type tubes. DSR 2023- 10.16.2 | - | Kg | 1 | - |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :, 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023- 5.2.2 | 0.2 | Cum | 1 | ₹0.2 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting and propping and removal of items for: Foundations, footings, base of columns, etc DSR 2023/5.9.1 DSR 2023- 5.9.1 | 1 | Sqm | 1 | ₹1 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.65 MB
TENDER_DOCUMENT.pdf
Tender Documents • 5.26 MB
BOQ_2128110.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .