Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.5 LAccepted-AOC ERODE | TAMIL NADU | 638001 | ₹12.5 L | 1 | Accepted-AOC Accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical rejected |
| Sl No | Description | Qty | Unit | MS CONSTRUCTION L1 | M.Murugan L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on the bank with initial lead and lift of 10 metres and initial lift of 2 metres in hard stiff stiff clay stiff block cotton hard red earth murram, gravel stoney earth and earth mixed with small size boulders and hard gravelly soils (SS 20 B) etc., complete as per standard specification | 80 | Cum | 263.75 ₹21,100 | 276.97 ₹22,157.60 |
| 2.00 | Plain cement concrete Using 1:4:8 mix ( One cement , four Sand and Eight aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 16 | Cum | 5,652.44 ₹90,439.04 | 5,935.66 ₹94,970.56 |
| 3.00 | Centering and shuttering for plain surfaces including cost and conveyance of all materials and all labour charges etc., complete as per standard specification. | 437 | Sqm | 488.97 ₹2.1 L | 513.47 ₹2.2 L |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 138 | Cum | 6,670.81 ₹9.2 L | 7,005.05 ₹9.7 L |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
8 Dec 2025, 3:00 pmClosed
Executive Officer
Town Panchayat Sambavarvadakarai
GF Vannan Kulakkarai salai Retaining wall
2025_DTP_628183_1
2025-26 GF Vannankulam Karai salai retaining wall in Sambavarvadakarai TP
Open Tender
Civil Works
180 days
sambavarvadakarai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
Yes
28 Mar 2026
2 Dec 2025
9 Dec 2025
2 Dec 2025
8 Dec 2025
2 Dec 2025
Earth work excavation and depositing on the bank with initial lead and lift of 10 metres and initial lift of 2 metres in hard stiff stiff clay stiff block cotton hard red earth murram, gravel stoney earth and earth mixed with small size boulders and hard gravelly soils (SS 20 B) etc., complete as per standard specification
Plain cement concrete Using 1:4:8 mix ( One cement , four Sand and Eight aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Centering and shuttering for plain surfaces including cost and conveyance of all materials and all labour charges etc., complete as per standard specification.
Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_751049.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
TenderNotice.pdf
Tender Documents • 0.12 MB
BOQ_751049.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid