Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC DOOR NO 7 121 SURVEY NO 7 121 K PUDUR | KANCHIPURAM | TAMIL NADU | 600069 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.2 L+₹51,593 (18.9%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | RAJAM CONSTRUCTIONS | SRI MARITHAI ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing brick masonry including cost of labour, lead, lift, etc. complete. | 0.6 | M3 | 270 ₹318.6 | 240 ₹283.2 Lowest |
| 2.00 | Plastering with CM 1:5, 12mm thick including cost of all materials, labour, lead, lift etc., complete. | 2.9 | M2 | 957 ₹1,129.26 | 870 ₹1,026.6 Lowest |
| 3.00 | Dismantling the existing aluminium doors including removal of frames, hinges & fastenings, including cost of all material, labour, lead, lift, etc. complete. | 2.55 | M2 | 510 ₹601.8 | 459 ₹541.62 Lowest |
| 4.00 | Providing and fixing in position of aluminium anodized glazed double leaf door with inner frame section using 45 x 45 x 2mm for top and middle and vertical, door frame section using 100 x 45 x 2mm for door and shutter bottom with 5mm thick plain glass with sun control film on top and bottom using aluminum anodized beading with all necessary standard hardwires such as handle, tower bolts, safety rod with full thread locking arrangement etc., complete including cost of all materials labour, lead, lift etc. complete. | 2.55 | M2 | 18,360 ₹21,664.8 | 17,850 ₹21,063 Lowest |
| 5.00 | Supplying and providing 5.5mm plain for windows after replacement of damaged glasses including fixing all other accessories such as 8mm U channel screws glass putty including cost of labour charges, lead, lift, etc., complete. | 1.8 | M2 | 6,840 ₹8,071.2 | 6,300 ₹7,434 Lowest |
| 6.00 | Providing false ceiling with Thermocool 25mm thick over the Aluminium section 25 x 25 x 1.6mm (T & L angle) with 50cm c/c in one direction 100cm c/c in another direction with 6mm dia M.S. rod as stiffner at a distance of 1.25m c/c including cost of all materials, labour, lead, lift, scaffolding charges etc., complete. | 22.55 | M2 | 22,550 ₹26,609 | 18,040 ₹21,287.2 Lowest |
| 7.00 | Providing two coats with ready mixed plastic emulsion (interior walls) of first class quality paint & approved colour including cost of all materials, scaffolding charges, thorough cleaning of surface, labour, lead, lift, curing, etc. complete. | 917.3 | M2 | 2,75,190 ₹3,24,724.2 | 2,29,325 ₹2,70,603.5 Lowest |
Tender Value
Refer Docs
EMD Value
₹2,500
Closing Date
30 Oct 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Repair Works to the TVMCC SWGR Room at 10.50m Floor in Unit 4 and 5
2025_EB_616985_1
CE SE C TTPS 323 2025 26
Open Tender
Civil Works - Others
Item Rate
30 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,500
Yes
14 Nov 2025
24 Oct 2025
31 Oct 2025
24 Oct 2025
30 Oct 2025
24 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_737256.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .