Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹8.6 L
EMD Value
₹9,000
Closing Date
27 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
Project Director, DRDA, Sivagangai
AGAMT II 2021-22 Samathuva Burial ground works at Singampunari Block in Sivagangai District - Package No. 52
2022_RDTN_242698_1
52_PACK_AGAMT II 21-22/SINGAI
Open Tender
Civil Works
Item Rate
90 days
Sivagangai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,000
13 Aug 2022
19 Jul 2022
27 Jul 2022
19 Jul 2022
27 Jul 2022
19 Jul 2022
Amount
Construction of a Waiting shed at Atrankarai Common burrial ground in D.Mampatty Village & Panchayat
Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for fOUNDATION Step etc complete
Earth work excavation from borrow pits for filling in all clause of soild, such as gravelly soil, hard stiff clay, stiff block cotton soil, hard red earth and earth mixed with 50% fair sized boulders and gravelly soil except sand, silt or other loose soils sandy loam etc., as per SS 20 A as per standard specification including spreading sectioning , etc, completed with initial lead and lift for raising and widening the existing road wherever necessary.
Clearing the Light jungle with out uprooting and including all cutting and depositing of the product removed from the site, disposal by burying or burining etc., complete.
Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for fOUNDATION etc complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Refilling the basement with excavated earth other than sand complying the Standard specification
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Below Basement
Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Above basement
Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement
Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Super structure in Ground floor
Supply & cost of fabrication steel including cost of steel & binding wire tying, bending in position etc
R.C.C. 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement
R.C.C. 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete for Super structure in Ground floor
Floor finishing with granolathic flooring with 12mm to 10mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Finishing the roof top with one course of pressed tiles including all cost & conveyance of all materials to site & all labour charges etc complete
Plastering with Cm 1:5 mix to 12mm thick including all cost & conveyance of all materials to site & all labour charges etc complete
Plastering with Cm 1:3 mix to 10mm thick including all cost & conveyance of all materials to site & all labour charges etc complete
Emulsion painting two coats with Emulsion Oil Paint including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of a Cremation shed in Common Burrial ground , Bath tub & Providing Extension of pipe line from Pappa Oorani bund to Burrial ground (368m) @ M.Soorakudi Village & Panchayat
Clearing the Light jungle with out uprooting and including all cutting and depositing of the product removed from the site, disposal by burying or burining etc., complete.
Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for fOUNDATION etc complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Refilling the basement with excavated earth other than sand complying the Standard specification
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Below Basement
Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Above basement
Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement
Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Super structure in Ground floor
Supply & cost of fabrication steel including cost of steel & binding wire tying, bending in position etc
R.C.C. 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement
R.C.C. 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete for Super structure in Ground floor
Finishing the roof top with one course of pressed tiles including all cost & conveyance of all materials to site & all labour charges etc complete
Plastering with Cm 1:5 mix to 12mm thick including all cost & conveyance of all materials to site & all labour charges etc complete
Plastering with Cm 1:3 mix to 10mm thick including all cost & conveyance of all materials to site & all labour charges etc complete
Emulsion painting two coats with Emulsion Oil Paint including all cost & conveyance of all materials to site & all labour charges etc complete
Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for fOUNDATION etc complete
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement
Providing additional strutting to centering of RCC slabs of plain surface for every additional 1.0 metre height or part thereof but not less than 30 cm, over the initial 3.00 metre height from floor level using casurina props of 10cm to 13cm dia including cross bracing etc., complete complying with standard specification and as directed by the department officers.
Supply & cost of fabrication steel including cost of steel & binding wire tying, bending in position etc
R.C.C. 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement
Plastering with Cm 1:4 mix to 20mm thick including all cost & conveyance of all materials to site & all labour charges etc complete
Plastering with Cm 1:5 mix to 12mm thick including all cost & conveyance of all materials to site & all labour charges etc complete
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 150MMx150MMx6MM of best quality including cost and conveyance of all materials to site and all labour charges etc
Colour washing two coats with department approved colour pigment including cost and conveyance of all materials to site and all labour charges etc
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers b Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil.SS20B (TWAD p - 270, Sch I. 1b)
Supply & cost of 63mm HDPE pipe (TWAD p - 29)
Supply & cost of 63mm PVC Elbow (TWAD p - 27, Sch I. 8)
Supply & cost of 63mm PVC End cap (TWAD p - 27, Sch I. 5)
Supply & cost of 63x32mm PVC Reducer (PWD - 108)
Supply & cost of 32mm PVC PPE(PWD - 108)
Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste. For depth upto 2m Upto 40mm dia (OD) PVC pipe (TWAD P - 248)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R VENKATESH
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .