Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.8 Cr
Closing Date
5 May 2022, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM(PJ-Contracts)
Indian Oil Corporation Limited (Pipelines Division) A-1, Udyog Marg, Sector-1, NOIDA (UP) 201 301
Laying of 42 inch OD Submarine Pipeline and Installation of 2 Nos of SPM System in Gulf of Kutch off Vadinar, Gujarat
2022_PLHO_146764_1
PLCC/VADINAR SPM/MNT/22009
Global Tenders
Mechanical Works
Tender cum Auction
450 days
Vadinar
Please refer Tender documents
8 documents required · 8 mandatory
₹1.8 Cr
Yes
Online through VC
17 Jun 2022
18 Feb 2022
6 May 2022
18 Feb 2022
5 May 2022
14 Mar 2022
28 Feb 2022
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | INSTALLATION OF SPM & PLEM SYSTEM | - | - | - | - |
| 3 | Pre-construction survey of SPM / PLEM location, anchor piles & PLEM piles, review of all documents, drawings, procedures, unloading, actual site installation activities etc by Marine Warranty Surveyor (MWS), "Receiving and taking-over" of SPM & PLEM system complete with tanker mooring system, floating & underbuoy hose system, anchor chains, anchor piles, PLEM piles, spool-piece components and all other associated equipment from SPM-C as per Scope of Work from designated place of issue, lifting & offloading of SPM from supplier’s cargo barge, towing, handling, installation of anchor piles, installation of PLEM piles and installation of SPM & PLEM system including co-ordination with SPM supplier, supply of adequate marine spreads, equipments, suitable barge with adequate crane capacity for safe taking-over of SPM from cargo barge, suitable barge with adequate crane capacity for safe installation of PLEMs, materials, consumables, pre-testing of subsystems, pre-tensioning of anchor chains, post testing, as-built survey, return of surplus materials to Company’s storage yard as directed by Engineer-in-charge, all works complete as per scope of work document no. B291-000-83-41-SOW-1001, specifications, drawings, standards, procedures & guidelines of SPM supplier & instructions of Engineer-in-charge. NOTE: Hiring and charges of MWS during unloading and site installation activities shall be in the scope of Installation Contractor. | - | - | - | - |
| 4 | SPM-N1 & PLEM-N1 system complete | - | LS | - | - |
| 5 | SPM-N2 & PLEM-N2 system complete | - | LS | - | - |
| 6 | INSTALLATION OF SUBMARINE PIPELINE (FROM PLEM TO LFP) | - | - | - | - |
| 7 | Laying / installation of coated line pipe, associated fittings and accessories, etc. as per scope of work, specifications, drawings, other provisions of bid document and instructions of Engineer-in-Charge within the provisions of contract document, including but not limited to carrying out the following:
Pre-construction survey of submarine pipeline route; review of all documents, drawings, procedures, actual site installation activities etc by Marine Warranty Surveyor (MWS), "Receiving and taking-over", handling, loading, transportation and unloading of Company supplied externally corrosion & concrete weight coated and bare line pipes and other materials from designated place(s) of issue / Company’s yard to Contractor's own stock-yard(s) / workshop(s) / lay barge / work-site(s); supply of all materials (except Company supplied materials), construction spreads, trenching & backfilling, all consumables, equipment, labour etc; Carrying out repairs of pipe and coating defects; Aligning, cutting and beveling (suitable for Automatic Welding) of pipes for welding and field adjustments, NDT of bevelled pipe ends, welding, carrying out nondestructive testing of welds as required including radiography etc.; Installation of concrete coated pipes; Coating of all field weld joints & laying of pipeline on seabed / in trench from lay barge; Trenching / dredging in all types of soils & backfilling of trench as specified & indicated in drawings; installation of pipeline in shore approaches, setting up of winch pad system and other equipments, stringing & fabrication yard at LFP, arrangement of land required, fabrication of Long radius bends from free issue pipes; Fabrication, pre-testing & installation of flanged tie-in spool for pipeline tie-in with PLEM; supply and installation of Mud mat / support (ULO type) at touch-down point of each tie in spool and support near Tie-in-point / PLEM joint, carrying out cleaning, gauging, caliper pigging, hydrotesting; Carrying out all temporary, ancillary, auxiliary works and all incidental works including repair of defects recorded during Caliper / gauge plate run, disposal of debris, restoration works and returning all surplus material including coated line pipe to company’s storage yard, as directed by Engineer-In-Charge; Obtaining work permits / NOC from various statutory authorities having jurisdiction, before execution of the work, and complying with all stipulation / conditions / recommendation of the said authorities; Preparation of as-built drawings, pipe-book and other records as per scope of work document no. B291-000-83-41-SOW-1001, specifications, standards, drawings and other provisions of bid document. NOTE:
a) This rate shall be applicable for subsea pipeline between PLEM and LFP including tie-in spool at PLEM ends and excluding IJ.
b) The quantity i.e. length indicated is approximate and payment shall be made as per actual length of installed pipeline. c) Hiring and charges of MWS shall be in the scope of Installation Contractor. | - | - | - | - |
| 8 | Installation of 42” pipeline section from LFP-N1 to SPM-N1 of wall thickness 24.0 mm. | - | M | - | - |
| 9 | Installation of 42” pipeline section from LFP-N2 to SPM-N2 of wall thickness 24.0 mm. | - | M | - | - |
| 10 | PIPELINE INSTALLATION - PLEM TO PLEM:Laying / installation of coated line pipe, associated fittings and accessories, etc. as per scope of work, specifications, drawings, other provisions of bid document and instructions of Engineer-in-Charge, including but not limited to carrying out the following:
Pre-construction survey of submarine pipeline route; review of all documents, drawings, procedures, actual site installation activities etc by Marine Warranty Surveyor (MWS), "Receiving and taking-over", handling, loading, transportation and unloading of Company supplied externally corrosion & concrete weight coated and bare line pipes and other materials from designated place(s) of issue / Company’s yard to Contractor's own stock-yard(s) / workshop(s) / lay barge / work-site(s); supply of all materials (except Company supplied materials), construction spreads, all consumables, equipment, labour etc; Carrying out repairs of pipe and coating defects; Aligning, cutting and beveling (suitable for Automatic Welding) of pipes for welding and field adjustments, NDT of bevelled pipe ends, welding, carrying out nondestructive testing of welds as required including radiography etc.; Installation of concrete coated pipes; Coating of all field weld joints & laying of pipeline on seabed / in trench from lay barge; fabrication of Long radius bends from free issue pipes; Fabrication, pre-testing & installation of flanged tie-in spool for pipeline tie-in with PLEMs, supply and installation of Mud mat / support (ULO type) at touch-down point of each tie in spool and support near Tie-in-point / PLEM joint, Carrying out cleaning, gauging, caliper pigging, hydrotesting; Carrying out all temporary, ancillary, auxiliary works and all incidental works including repair of defects recorded during Caliper / gauge plate run, disposal of debris, restoration works and returning all surplus material including coated line pipe to Company’s storage yard, as directed by Engineer-In-Charge; Obtaining work permits / NOC from various statutory authorities having jurisdiction, before execution of the work, and complying with all stipulation / conditions / recommendation of the said authorities; Preparation of as-built drawings, pipe-book and other records as per scope of work document no. B291-000-83-41-SOW-1001, specifications, standards, drawings and other provisions of bid document.
NOTE:
a) This rate shall be applicable for subsea pipeline between PLEM-N1 to PLEM-N2 including tie-in spool at both PLEM ends.
b) Hiring and charges of MWS shall be in the scope of Installation Contractor. | - | - | - | - |
| 11 | Installation of 42" pipeline section from PLEM-N1 to PLEM-N2 of wall thickness 24.0 mm. | - | M | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ_156990.xls
BOQ Document • 0.29 MB
92784916.pdf
Tender Document • 0.26 MB
Tender-Acceptance-Format.pdf
Tender Document • 0.08 MB
FAQs-IOCL-Online-EMD.pdf
Tender Document • 0.55 MB
Special_Instructions_to_the_Bidders_20210705v1a.pdf
Tender Document • 1.46 MB
EIA_Report_with_Annexures.pdf
Tender Document • 27.79 MB
TENDERDOCUMENT21034FILE1OF7.pdf
Tender Document • 26.82 MB
TENDERDOCUMENT21034FILE2OF7.pdf
Tender Document • 30.16 MB
TENDERDOCUMENT21034FILE3OF7.pdf
Tender Document • 30.42 MB
TENDERDOCUMENT21034FILE4OF7.pdf
Tender Document • 32.08 MB
TENDERDOCUMENT21034FILE5OF7.pdf
Tender Document • 30.27 MB
TENDERDOCUMENT21034FILE6OF7.pdf
Tender Document • 35.53 MB
TENDERDOCUMENT21034FILE7OF7.pdf
Tender Document • 28.39 MB
Tenderdocument22009.pdf
Tender Document • 8.01 MB
92784918.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .