Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹33.1 L+₹8.1 L (32.2%)Rejected-Finance AT E 23 KARAMPURA NEW DELHI PIN 110015 | L2 | Rejected-Finance Due to L2 | |
| 3 | Rejected-Technical A CLASS GOVT CONTRACTOR V P O TANEHAR TEHSIL DHARAMPUR DISTT MANDI | - | Rejected-Technical Reject |
Tender Value
₹23.4 L
EMD Value
₹47,000
Closing Date
26 Apr 2022, 6:00 pmClosed
E. E. SHIMLA DIVISION NO. III, HPPWD, Shimla-3
E. E. SHIMLA DIVISION NO. III, HPPWD, Shimla-3
Special Repair to Rajiv Gandhi Govt Degree College Kotshera Building near Chaura Maidan Shimla SH Construction of Multi purpose Court Synthetic Acrylic Basket Ball Court
2022_PWD_59597_1
SD-III/22-560-77 Dt.11-4-22
Open Tender
Civil Works - Buildings
Item Rate
90 days
Chaura Maidan Shimla
As per SBD
12 documents required · 12 mandatory
₹500
₹47,000
7 Jul 2023
16 Apr 2022
27 Apr 2022
16 Apr 2022
26 Apr 2022
16 Apr 2022
Amount
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads and lifts and dressing of sides and bottom and backfilling in trenches with excavated suitable material including saturated soil comprising of pick work, jumper work, and blasting work both in soft and hard rock with chiselling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and as directed by the Engineer -in-Charge at site and sorting out useful and un- useful material and transportation of the un -useful material for disposing at approved dumping site or otherwise and including payment of prescribed charges of dumping to the owner of dumping site (to be arranged by the contractor) for the satisfaction of Engineer- in -Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour (if required). Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Stone soling properly hand-packed filling interstices with Kharanja stone including spreading watering of binding materials moorum or earth etc. complete as per HP.PWD specification 150mm spread thickness (finished work including materials and labour) including carriage of materials within all leads and lifts.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20mm nominal size) complete including carriage of materials within all leads and lifts as per direction of Engineer - in - charge.
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. complete including carriage of materials within all leads and lifts as per direction of Engineer - in - charge.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405.including carriage of materials within all leads and lifts as per direction of Engineer - in - charge. By Manual Means WBM Grading 1
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fillup the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.including carriage of materials within all leads and lifts as per direction of Engineer - in - charge. By Manual Means WBM Grading 2
P/A Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per Technical Specifications Clause 503.including carriage of materials within all leads and lifts as per direction of Engineer - in - charge.
20mm thick Open-Graded Premic carpet using Bituminous (Penetration grade/ modified bitumen) Binder. Providing , laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregate either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base i/c mixing in suitable paint, laying and rolling with a three wheel 80-100KN static roller capacity, followed by seal coat of either Type A or Type B or Type C as per technical Specification Clause 508. BITUMEN (S-90)including carriage of materials within all leads and lifts as per direction of Engineer - in - charge. by Manual means
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical specifications clause 510. Type B BITUMEN (S-90) by Manual Means. including materials and labour) including carriage of materials within all leads and lifts.
P/L ITF approved Acrylic of 8 layers for BasketBall Synthetic court. 8 Layer Acrylic Synthetic Coating (3-4mm) For Futsal Court. PROCEDURE OF WORK:• Scope of Work.: Acrylic Synthetic Coating• Preparation: The surface shall be cleanedthoroughly with water to remove all dust & dirt,filling up the depressions with chemically basedsealer etc.• Priming & sealing (BASE COAT): One coat ofprimer base coat shall be spray and let it cured for3 hours.• Resurface Coat: The Sealer coat will be appliedin layer as required and same will be cured. • Cushion Coat: Four layer of Cushion coat will be applied in layer as required and same will be cured for minimum 24 hours. • Colour Coat: Two coats of top coat will beapplied, 1 coat with squeeze & one coat withroller of approved shade. • Finally the line marking will be done with white Colour and outside marking to demarked the court colour• Line Marking as per international Standards .including materials and labour) including carriage of materials within all leads and lifts.
Providing and Fixing Hydraulic Movable Basketball Poles. (i/c 30mm fibre board, BasketBall Dunking ring and net.)including materials and labour) including carriage of materials within all leads and lifts.
Providing and Fixing Movable Badminton Poles. (i/c badminton net and wire)including materials and labour) including carriage of materials within all leads and lifts.
Providing and Fixing Movable VolleyBall Poles. (i/c Volleyball net and wire)including materials and labour) including carriage of materials within all leads and lifts.
Supplying and fixing wovenplains G.I. wire fencing . Fencing:Supply, Fabrication & Installation of steel structure for net framing around perimeter of multisport court with necessary vertical and horizontal pipe structure support at regular intervals including all doors, locks & goal post.1. 8 Feet height from ground level and 2 feet inside the ground 2. vertical pole 3. Vertical Pole to pole distance 10 Feet 4. Top, centre & bottom horizontal pipe support .5. Round Horizontal pipe size (50mm x 50mmx 2mm).6. single door : 7” x 3”. 7. Red Oxide and 2 coats of oil paint.8. Installation of G.I. net all around Vertical net 50mm x 50mm x 2.5mm thick.including carriage of materials within all leads and lifts as per direction of Engineer - in - charge.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works complete including carriage of materials within all leads and lifts.
Disposal of surplus excavated earth by Mechanical with in all leads on approved dumping site of M.C. Shimla or otherwise including payment of prescribed charges of dumping to the owener of dumping site through all mode of transportation including head load animal load or mechanical means alongwith its leveling and to complete the work of mechanized means and labour (if any required).The dumping site to be arranged by the contractor entirely at his own risk and cost. All useful materials such as stones, aggregate and slates shall be sorted out and stacked along roads side any loss of the public/private property during the course of diisposal shall be the absolute responsibility of the contractor which shall have to be dully compensated by him in all respect as per direction of Engineer-in-Charge.
shiv naresh sports pvt ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .