Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.8 LAccepted-AOC | 1 | Accepted-AOC Bidder Quoted lower than estimate value | |
| 2 | 2₹14.7 L+₹88,489.20 (6.39%)Rejected-Finance 422 PALLADAM ROAD TIRUPPUR 641 604 | TIRUPPUR | TAMIL NADU | 641604 | 2 | Rejected-Finance Bidder quoted more than estimate value |
| Sl No | Description | Qty | Unit | R. THIRUMALAI GURUSAMY L1 | Raja Constructions L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 2 | 1M³ | 234 ₹468 Lowest | 250 ₹500 |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. - Mixing by manual means | 1 | 1M³ | 5,188 ₹5,188 Lowest | 5,520 ₹5,520 |
| 3.00 | Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x70mm with class designation of 10 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | 3 | 1M³ | 7,629 ₹22,887 Lowest | 8,116 ₹24,348 |
| 4.00 | Plastering with cement mortar 1:5 mix (one cement five P-sand), 12mm thick in all floors using clean screened M-Sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification. | 19 | 1M² | 282 ₹5,358 Lowest | 300 ₹5,700 |
| 5.00 | Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick), etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid) | 4 | 1M² | 916 ₹3,664 Lowest | 975 ₹3,900 |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 0.8 | 1Qtl | 8,907 ₹7,125.6 Lowest | 9,476 ₹7,580.8 |
| 7.00 | Reinforced Cement Concrete 1:1½:3 (One Cement, One and a half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - manual mix | 1 | 1M³ | 9,064 ₹9,064 Lowest | 9,644 ₹9,644 |
| 8.00 | Paving the floor with best approved quality fine polished Granite Stone Slabs of size 4'x2' and Variety Ruby Red, Raw Silk with machine cut edges laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three crushed stone sand) with required Cement Slurry and Mortar Plasticizer and laid in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments etc., complete complying with standard speicification and as directed by the departmental officers.(The granite stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work) | 3 | 1M² | 2,533 ₹7,599 Lowest | 2,695 ₹8,085 |
| 9.00 | ABS DOOR ( Plain Pre-laminated )
Providing of 35mm thick factory made Pre-laminated ABS (Acrolynitrile Butadiene Styrene) Door Shutter moulded in different designs, consisting of all round frame made out of water proof solid foam PVC bar of size 20 x 32mm, reinforced by 32 x 32mm - 2 Nos., for vertical made out of LVL (Laminated Veneer Lumber), core material of 32mm thick high density craft paper honey comb board, sandwiched on both sides with pre-laminated ABS sheet thickness of 1.5mm. PVC edge banding of size 0.45mm on the vertical sides. Hardware made out of steel coated butterfly hinges - 3 Nos., for each shutter and ISI make SS round lock complete for finished item of work, complete complying with the standard specification. The door shutter and frame should be got approved from the Executive Engineer before use on work | 10 | 1M² | 5,589 ₹55,890 Lowest | 5,946 ₹59,460 |
| 10.00 | Providing UPVC (Un-Plasticized Polyvinyl Chloride) Door: Providing and fixing casement doors fabricated from unplasticized polyvinyl chloride (uPVC) sections.
Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals.
Hardware: All the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside. Glazing: The window system should be glazed with 5mm plain float glass / 6mm bison lam Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly to the plastered brick wall using self expanding nylon plug and driving ms electroplated screws into plug. | 3 | 1M² | 7,814 ₹23,442 Lowest | 8,313 ₹24,939 |
Tender Value
₹15.2 L
EMD Value
₹30,400
Closing Date
20 Feb 2026, 3:00 pmClosed
Commissioner Tiruppur City Municipal Corporation
Tiruppur City Municipal Corporation
Maintanence and Repair Work for TSK Hospital in Ward No 30
2026_MAWS_655240_26
E1/2942/2025
Open Tender
Civil Works
Works
90 days
Tiruppur City Municipal Corporation
Ple refer Tender Notice
3 documents required · 3 mandatory
₹0
₹30,400
24 Sept 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 2 | 1M³ | - | - |
| 2 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. - Mixing by manual means | 1 | 1M³ | - | - |
| 3 | Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x70mm with class designation of 10 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | 3 | 1M³ | - | - |
| 4 | Plastering with cement mortar 1:5 mix (one cement five P-sand), 12mm thick in all floors using clean screened M-Sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification. | 19 | 1M² | - | - |
| 5 | Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick), etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid) | 4 | 1M² | - | - |
| 6 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 0.8 | 1Qtl | - | - |
| 7 | Reinforced Cement Concrete 1:1½:3 (One Cement, One and a half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - manual mix | 1 | 1M³ | - | - |
| 8 | Paving the floor with best approved quality fine polished Granite Stone Slabs of size 4'x2' and Variety Ruby Red, Raw Silk with machine cut edges laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three crushed stone sand) with required Cement Slurry and Mortar Plasticizer and laid in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments etc., complete complying with standard speicification and as directed by the departmental officers.(The granite stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work) | 3 | 1M² | - | - |
| 9 | ABS DOOR ( Plain Pre-laminated )
Providing of 35mm thick factory made Pre-laminated ABS (Acrolynitrile Butadiene Styrene) Door Shutter moulded in different designs, consisting of all round frame made out of water proof solid foam PVC bar of size 20 x 32mm, reinforced by 32 x 32mm - 2 Nos., for vertical made out of LVL (Laminated Veneer Lumber), core material of 32mm thick high density craft paper honey comb board, sandwiched on both sides with pre-laminated ABS sheet thickness of 1.5mm. PVC edge banding of size 0.45mm on the vertical sides. Hardware made out of steel coated butterfly hinges - 3 Nos., for each shutter and ISI make SS round lock complete for finished item of work, complete complying with the standard specification. The door shutter and frame should be got approved from the Executive Engineer before use on work | 10 | 1M² | - | - |
| 10 | Providing UPVC (Un-Plasticized Polyvinyl Chloride) Door: Providing and fixing casement doors fabricated from unplasticized polyvinyl chloride (uPVC) sections.
Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals.
Hardware: All the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside. Glazing: The window system should be glazed with 5mm plain float glass / 6mm bison lam Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly to the plastered brick wall using self expanding nylon plug and driving ms electroplated screws into plug. | 3 | 1M² | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.26 MB
26_Conditions.pdf
Tender Documents • 0.61 MB
BOQ_786016.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .