| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-AOC PINE DALE PINE MOUNT RIDGE SHILLONG 793001 | EAST KHASI HILLS | MEGHALAYA | 793001 | ₹30.1 L Quoted ₹32.0 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹36.3 L+₹4.3 L (13.4%)Rejected-Finance RONGMEN BLOCK IV NEAR UMROI MILITARY STATION P O BARAPANI SHILLONG 793103 | SHILLONG | RI BHOI | MEGHALAYA | 793103 | ₹36.3 L+₹4.3 L (13.4%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹36.9 L+₹5.0 L (15.6%)Rejected-Finance C O T ALI NEAR TRIPURA CASTLE ROAD CLEVE COLONY SHILLONG 793003 MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793003 | ₹36.9 L+₹5.0 L (15.6%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹37.2 L+₹5.2 L (16.4%)Rejected-Finance DEEDAR MARKET ROOM NO 16 POLICE BAZAR SHILLONG 793001 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793001 | ₹37.2 L+₹5.2 L (16.4%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹38.1 L+₹6.1 L (19.1%)Rejected-Finance | ₹38.1 L+₹6.1 L (19.1%) | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | DWEL ENTERPRISE L5 | M/S DEEDAR ENTERPRISE L6 | M/s A L Traders L1 | M/S AKC ENTERPRISE L3 | M S Umesh and Co L2 | TN CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00M & L for disconnecting all incoming and outgoing cables of transformers of following capacities at various locations installed on two pole/four pole structures/on platforms at Station, opening the top cover, carrying out following activities :- (a) Draining out all the transformer oil to clean barrel for reuse. (b) Dismantling of all attachment viz breather assy, conservator, oil temperature gauge, HT/LT bushing etc and keeping aside for re-use and re-assembling the serviceable dismantled parts/new spare by providing new insulation materials, gasket, nuts & bolts etc. (c) Inspection of transformer core and winding, drying out transformer core and winding in vacuum chamber till specified IR values are obtained. (d) Cleaning of complete transformer tank, oil fins, removing of sludge and making the inside surface of tank dry by blowing of hot air as directed. Note : Dehydration of collected transformer oil shall be measured and paid seperately | |||||||||
| 1.01 | Transformer of capacity For 100 KVA | 3 | Each Job | 4,800 ₹14,400 | 5,000 ₹15,000 | 4,000 ₹12,000 Lowest | 5,000 ₹15,000 | 8,000 ₹24,000 | 5,100 ₹15,300 |
| 1.02 | Transformer of capacity For 200 KVA | 4 | Each Job | 6,500 ₹26,000 | 6,000 ₹24,000 | 5,000 ₹20,000 Lowest | 6,000 ₹24,000 | 9,000 ₹36,000 | 5,950 ₹23,800 |
| 1.03 | Transformer of capacity For 250KVA | 1 | Each Job | 6,900 ₹6,900 | 7,000 ₹7,000 | 6,000 ₹6,000 Lowest | 7,500 ₹7,500 | 8,000 ₹8,000 | 7,500 ₹7,500 |
| 1.04 | Transformer of capacity For 315KVA | 4 | Each Job | 8,700 ₹34,800 | 8,000 ₹32,000 | 7,000 ₹28,000 Lowest | 9,500 ₹38,000 | 9,000 ₹36,000 | 8,350 ₹33,400 |
| 1.05 | Transformer of capacity For 400KVA | 2 | Each Job | 9,800 ₹19,600 | 9,000 ₹18,000 | 8,000 ₹16,000 Lowest | 10,000 ₹20,000 | 9,500 ₹19,000 | 8,975 ₹17,950 |
| 1.06 | Transformer of capacity For 500KVA | 2 | Each Job | 10,000 ₹20,000 | 10,000 ₹20,000 | 9,000 ₹18,000 Lowest | 10,000 ₹20,000 | 10,500 ₹21,000 | 10,100 ₹20,200 |
| 1.07 | Transformer of capacity For 630KVA | 1 | Each Job | 12,000 ₹12,000 | 11,000 ₹11,000 | 10,000 ₹10,000 Lowest | 14,000 ₹14,000 | 11,500 ₹11,500 | 11,100 ₹11,100 |
| 2.00M & L for disconnecting all incoming and outgoing cables of Voltage stablizers of following capacities at various locations installed on two pole/four pole structures/on platforms at Station, opening the top cover, carrying out following activities :- (a) Draining out all the transformer oil to clean barrel for reuse. (b) Dismantling of all attachment viz breather assy, conservator, oil temperature gauge, HT/LT bushing etc and keeping aside for re-use and re-assembling the serviceable dismantled parts/new spare by providing new insulation materials, gasket, nuts & bolts etc. (c) Inspection of transformer core and winding, drying out transformer core and winding in vacuum chamber till specified IR values are obtained. (d) Cleaning of complete transformer tank, oil fins, removing of sludge and making the inside surface of tank dry by blowing of hot air as directed. Note : Dehydration of collected transformer oil shall be measured and paid under respective item of BOQ here-in-after. | |||||||||
| 2.01 | Automatic Voltage stablizers of capacity 600 KVA | 1 | Each Job | 10,000 ₹10,000 | 10,000 ₹10,000 | 9,000 ₹9,000 Lowest | 9,000 ₹9,000 Lowest | 9,000 ₹9,000 Lowest | 9,900 ₹9,900 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
16 Jun 2026, 6:00 pmClosed
GE (I) (AF) Shillong
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
PERIODICAL MAINTENANCE OR REPAIRS OF TRANSFORMER, VOLTAGE STABILIZER AND APFC AND ALLIED WORKS AT 509 SU AF STATION LAITKOR PEAK UNDER GE (I) (AF) SHILLONG
2026_MES_767755_1
8036/26/E8
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
GE (I) (AF) Shillong
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (I) (AF) Shillong
₹60,000
Yes
27 Jul 2026
26 May 2026
18 Jun 2026
26 May 2026
16 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1M & L for disconnecting all incoming and outgoing cables of transformers of following capacities at various locations installed on two pole/four pole structures/on platforms at Station, opening the top cover, carrying out following activities :- (a) Draining out all the transformer oil to clean barrel for reuse. (b) Dismantling of all attachment viz breather assy, conservator, oil temperature gauge, HT/LT bushing etc and keeping aside for re-use and re-assembling the serviceable dismantled parts/new spare by providing new insulation materials, gasket, nuts & bolts etc. (c) Inspection of transformer core and winding, drying out transformer core and winding in vacuum chamber till specified IR values are obtained. (d) Cleaning of complete transformer tank, oil fins, removing of sludge and making the inside surface of tank dry by blowing of hot air as directed. Note : Dehydration of collected transformer oil shall be measured and paid seperately | |||||
| 1.01 | Transformer of capacity For 100 KVA | 3 | Each Job | - | - |
| 1.02 | Transformer of capacity For 200 KVA | 4 | Each Job | - | - |
| 1.03 | Transformer of capacity For 250KVA | 1 | Each Job | - | - |
| 1.04 | Transformer of capacity For 315KVA | 4 | Each Job | - | - |
| 1.05 | Transformer of capacity For 400KVA | 2 | Each Job | - | - |
| 1.06 | Transformer of capacity For 500KVA | 2 | Each Job | - | - |
| 1.07 | Transformer of capacity For 630KVA | 1 | Each Job | - | - |
| 2M & L for disconnecting all incoming and outgoing cables of Voltage stablizers of following capacities at various locations installed on two pole/four pole structures/on platforms at Station, opening the top cover, carrying out following activities :- (a) Draining out all the transformer oil to clean barrel for reuse. (b) Dismantling of all attachment viz breather assy, conservator, oil temperature gauge, HT/LT bushing etc and keeping aside for re-use and re-assembling the serviceable dismantled parts/new spare by providing new insulation materials, gasket, nuts & bolts etc. (c) Inspection of transformer core and winding, drying out transformer core and winding in vacuum chamber till specified IR values are obtained. (d) Cleaning of complete transformer tank, oil fins, removing of sludge and making the inside surface of tank dry by blowing of hot air as directed. Note : Dehydration of collected transformer oil shall be measured and paid under respective item of BOQ here-in-after. | |||||
| 2.01 | Automatic Voltage stablizers of capacity 600 KVA | 1 | Each Job | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tender8036.pdf
Tender Documents • 0.93 MB
BOQ_859798.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .