| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 LAccepted-Finance | L1 | Accepted-Finance accepted | |
| 2 | L2₹29.6 L+₹6,601.15 (0.22%)Accepted-Finance | L2 | Accepted-Finance rate quoted more than estimate |
| Sl No | Description | Qty | Unit | VELAN CONSTRUCTIONS H1 | S DURAI H2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 | 97 | M3 | 187 ₹18,139 | 186 ₹18,042 Lowest |
| 2.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 (Open Earth work) PLINTH BEAM | 13 | M3 | 93 ₹1,209 Lowest | 93 ₹1,209 Lowest |
| 2.20 | DRAIN | 15 | M3 | 142 ₹2,130 | 141 ₹2,115 Lowest |
| 3.00 | Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 8 | M3 | 1,596 ₹12,768 Lowest | 1,596 ₹12,768 Lowest |
| 4.00 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 28 | M3 | 265 ₹7,420 | 264 ₹7,392 Lowest |
| 5.00 | Plain Cement Concrete 1:4:8 (one cement four Parts of crushed stone M-sand and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (The crushed stone sand to be used on cocrete work shell conform to gradation as per IS :383-1970 ) | 18 | M3 | 4,892 ₹88,056 Lowest | 4,892 ₹88,056 Lowest |
| 6.00 | Brick work in CM 1:5 (one cement & five Parts of crushed stone M-sand) using II class ground moulded bricks of size 9"X43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT FOUNDATION | 21 | M3 | 7,000 ₹1,47,000 Lowest | 7,000 ₹1,47,000 Lowest |
| 6.30 | GROUND FLOOR | 30 | M3 | 7,732 ₹2,31,960 Lowest | 7,732 ₹2,31,960 Lowest |
| 7.00 | Brick Partition Walls using II class ground moulded chamber bricks of size 9"X43/8"X 23/4" in C.M 1:3 (one cement & Three Parts of crushed stone M-sand) using hoop iron reinforcement,if found necessary standard specification including finishing, curing,etc., complete complying with standard specification - 10 sqm | 12 | M3 | 889 ₹10,668 Lowest | 889 ₹10,668 Lowest |
| 8.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specification. (Payment for centering shall be given after the concrete is laid) FOOTING | 85 | M2 | 844 ₹71,740 Lowest | 844 ₹71,740 Lowest |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
23 Nov 2023, 3:00 pmClosed
COMISSIONER
Commissioner pernambut municipality pernambut
Construction of urban health sub center building at ward 18 chowk road 12
2023_MAWS_389685_1
1093/2023/E1
Open Tender
Civil Works - Buildings
Works
180 days
PERNAMBUT
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
COMMISSIONER PERNAMBUT MUNICIPALITY
₹30,000
Yes
15 Oct 2026
17 Nov 2023
23 Nov 2023
17 Nov 2023
23 Nov 2023
17 Nov 2023
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .