| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | L1 | Accepted-AOC Lowest rate | |
| 2 | L2₹16.2 L+₹25,264.64 (1.58%)Rejected-Finance | L2 | Rejected-Finance Highest rate |
| Sl No | Description | Qty | Unit | MR.R.RABIN KUMAR, CONTRACTOR L1 | MURUGAN,CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B | 42.92 | cum | 263 ₹11,287.96 Lowest | 300 ₹12,876 |
| 2.00 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for corewall as per SS 20B | 1.15 | cum | 197 ₹226.55 Lowest | 250 ₹287.5 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete | 15.63 | cum | 5,281 ₹82,542.03 Lowest | 5,300 ₹82,839 |
| 4.00 | Random Rubble Measonry in CM 1:5 mix using required bond stone with simulataneous pointing including all cost and conveyance and all labour charges etc., complete. | 1.8 | cum | 5,649 ₹10,168.2 Lowest | 5,700 ₹10,260 |
| 5.00 | Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete | 30.34 | cum | 6,084 ₹1,84,588.56 Lowest | 6,100 ₹1,85,074 |
| 6.00 | Refilling the basement with excavated earth including all labour charges such as watering and ramming etc., complete as per standard specification. | 19.74 | cum | 45 ₹888.3 Lowest | 100 ₹1,974 |
| 7.00 | Supplying and filling of conveyed Earth by lorry in basement filling including stacking for premeasurement, conveyance loading, and unloading charges and all other incidential charges and including filling laying watering and consolidating etc., complete. | 21.84 | cum | 168 ₹3,669.12 Lowest | 200 ₹4,368 |
| 8.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. Up to Basement | 60.44 | sqm | 547 ₹33,060.68 Lowest | 600 ₹36,264 |
| 9.00 | ii) Above Basement | 176.11 | sqm | 1,095 ₹1,92,840.45 Lowest | 1,100 ₹1,93,721 |
| 10.00 | Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete. | 3,773.27 | Kg | 91.8 ₹3,46,386.19 Lowest | 93 ₹3,50,914.11 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
19 Feb 2026, 3:00 pmClosed
Commissioner, Panchayat Union, Vallioor
Panchayat Union Office, Vallioor
Construction of Multi Purpose Building at Ambalavanapuram Sidha Hospital campus in Avaraikulam Village Panchayat, Valliyoor Panchayat Union
2026_RDTN_656994_6
GF a2/1896/25 - 8nos.
Open Tender
Civil Works
Works
Avaraikulam panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
17 Mar 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B | 42.92 | cum | - | - |
| 2 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for corewall as per SS 20B | 1.15 | cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete | 15.63 | cum | - | - |
| 4 | Random Rubble Measonry in CM 1:5 mix using required bond stone with simulataneous pointing including all cost and conveyance and all labour charges etc., complete. | 1.8 | cum | - | - |
| 5 | Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete | 30.34 | cum | - | - |
| 6 | Refilling the basement with excavated earth including all labour charges such as watering and ramming etc., complete as per standard specification. | 19.74 | cum | - | - |
| 7 | Supplying and filling of conveyed Earth by lorry in basement filling including stacking for premeasurement, conveyance loading, and unloading charges and all other incidential charges and including filling laying watering and consolidating etc., complete. | 21.84 | cum | - | - |
| 8 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. Up to Basement | 60.44 | sqm | - | - |
| 9 | ii) Above Basement | 176.11 | sqm | - | - |
| 10 | Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete. | 3,773.27 | Kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_789305.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_789305.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .