| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Fee/PreQual/Technical/Finance | -36.11% | ₹5.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.3 L+₹70,669.89 (12.7%)Admitted-Fee/PreQual/Technical/Finance | -28.00% | ₹6.3 L+₹70,669.89 (12.7%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.4 L+₹79,470.95 (14.3%)Admitted-Fee/PreQual/Technical/Finance | -26.99% | ₹6.4 L+₹79,470.95 (14.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.5 L+₹94,894.59 (17.0%)Admitted-Fee/PreQual/Technical/Finance | -25.22% | ₹6.5 L+₹94,894.59 (17.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹6.6 L+₹1.1 L (19.4%)Admitted-Fee/PreQual/Technical/Finance | -23.71% | ₹6.6 L+₹1.1 L (19.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.7 L
EMD Value
₹17,420
Closing Date
20 Aug 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SRINAGAR MUNICIPAL CORPORATION REGAL LANE LAL CHOWK
Chain Link Fencing around Graveyard at Pazwalpora Shalimar
2026_HAUDD_318044_8
SHORT Term NOTICE INVITING ETENDER No. 22 of 2026-2027 Dated 27.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
60 days
Graveyard at Pazwalpora Shalimar
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹601
FA/CAO AC NO 0216010200000007
₹17,420
24 Aug 2026
27 Jul 2026
21 Aug 2026
28 Jul 2026
20 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of Labours for site Clearance | 4 | No | 553 | ₹2,212 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed all kinds of soil 50 meter beyond 1 m from cutting edge. | 18.05 | Cum | 479.3 | ₹8,651.37 |
| 3 | Providing & laying stone soiling including compacting, watering including all carriages of material complete | 4.93 | Cum | 850 | ₹4,190.5 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.73 | Cum | 5,202.9 | ₹19,406.82 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 52.92 | Cum | 6,591.25 | ₹3,48,808.95 |
| 6 | Centring and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 197.49 | Sqm | 286.35 | ₹56,551.26 |
| 7 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in- charge to made of G.I. wire of dia 4 mm PVC coated to achieve outer dia not less than 5 mm in required colour and shade | 117.1 | Sqm | 809.9 | ₹94,839.29 |
| 8 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete welded | 1,675.28 | Kg | 138.2 | ₹2,31,523.7 |
| 9 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc complete Hot finished welded type tubes. | 230.12 | kg | 156.95 | ₹36,117.33 |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work | 118.22 | Sqm | 131.85 | ₹15,587.31 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_1046570.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .