| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance Lowest |
| 2 | L2₹1.1 Cr−₹13,402.44 (0.13%)Accepted-Finance | ₹1.1 Cr−₹13,402.44 (0.13%) | L2 | Accepted-Finance Highest |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
26 Feb 2020, 3:00 pmClosed
BDO, Borobazar T.D Block, Borobazar
O/o the BDO, Borobazar T.D Block, Borobazar
Package No 16
2020_BoTC_16473_1
TECH- 01/BDO/e-tender/2019-20/ 06
Open Tender
Civil Works
Item Rate
180 days
Bijni
Please Refer to SBD
4 documents required · 4 mandatory
₹3,190
Principal Secretary, BTC Kokrajhar
₹2.1 L
Yes
13 Mar 2020
19 Feb 2020
26 Feb 2020
19 Feb 2020
26 Feb 2020
19 Feb 2020
Amount
Laying and Jointing PVC Pipe. Heading
1.1 Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified. (A) Up to a depth of 2.00m below the existing ground level. (a) In ordinary soil
4.1.1 Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete. (a).Brick on flat soling.
2.1.1 Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc. as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately).
18.1.1 Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. (No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) (Upto 1st floor level) a) From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL
2.2.1 Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) (A) In substructure up to plinth level
2.2.1 Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) (B) In super structure from plinth level up to 1st floor level.
4.1.8 1st class brick nogged wall in cement mortar including racking out joints and curing complete as directed in super structure above plinth up to 1st floor level (protruding M.S rod/Tor steel of column to be embeded in cement mortar and will be measured and paid separately) (A) 112mm thick brick wall (a) In cement mortar in proportion 1:4. (1 cement:4 sand)
6.2.2 15 mm thick Cement plaster in single coat on single or half brick wall for interior plastering up to 1st floor level including arises, internal rounded angles, not exceeding 80mm girth and finished even and smooth including curing complete as directed. A) On rough side b) In cement mortar 1:4
3.1.1 Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in: 3.1.1.1 Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc. (b) Using 25mm thick plank
3.1.1.4 Sides and Soffits of Beams, beam haunchings, cantilever girders, bressumers, lintels and horizontal ties.
3.1.1.3 Columns, Pillars, Posts & Strut (a) Square, Rectangular, polygonal in plan or any shape like Tee/L etc. having plane vertical face
17.11 Supplying, fitting and fixing double leaf heavy duty iron gate, frame made from 50mm x 6mm M.S. flat iron with another horizontal flat at the middle, 20mm dia M.S bars at 200mm apart from bottom flat to top flat and 20 mm dia M.S. bars at 200mm apart from bottom flat to middle flat including drilling, welding etc. complete. All vertical bars are to be protruded at least 100mm above the middle and top flat is to be flattended and pointed as directed. Necessary locking arrangement on both faces, arrangement for temporary closing the gate and 2 nos.( minium) strong iron hinges of M.S bars and flat of same sizes on each leaf to be embeded in C.C brick pillars as necessary including a red oxide painting to all iron works as directed and specified. (Separate payment will be made for posts).
SRI DWMWILU BRAHMA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .