Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.6 LAccepted-AOC | L1 | Accepted-AOC being L1 | |
| 2 | L2₹65.6 LSame as L1Rejected-Finance AUCKLAND ZIGZAG ROAD MERRY VILLA DARJEELING | DARJEELING | DARJEELING | WEST BENGAL | 734101 | L2 | Rejected-Finance BEING L2 | |
| 3 | L3₹65.6 LSame as L1Rejected-Finance | L3 | Rejected-Finance BEING L3 |
Tender Value
₹65.6 L
EMD Value
₹1.3 L
Closing Date
16 Feb 2026, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer TED
OFFICE OF THE EXECUTIVE ENGINEER TAKDAH ENGINEERING DIVISION (6TH MILE NAYA BUSTY, DARJEELING
Construction of Community Hall at Upper Labdah Baghbazar, Mungpoo, under R.R. Block,GTA.
2026_GTA_998254_5
GTA/EE/TED/NIeT-16(1st Call)/e-Tender/2025-26
Open Tender
CIVIL WORKS
Percentage
240 days
Takdah
AS PER NIeT
5 documents required · 5 mandatory
₹0
₹1.3 L
Yes
20 Sept 2026
3 Feb 2026
19 Feb 2026
3 Feb 2026
16 Feb 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Siliguri .(a) Depth of excavation not exceeding 1.500 mm. | 234.65 | %cum | 119.27 | ₹27,986.71 |
| 2 | (II) Cement concrete with 40 mm. down graded shingles excluding shuttering.In ground floor or foundation(b) N.B. veriety (a) 1:3:6 proportion | 37.08 | cum | 5,971.2 | ₹2,21,412.1 |
| 3 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the nterstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 303.07 | Sqm | 50 | ₹15,153.5 |
| 4 | Cost of stone boulder 150 mm size delivered ans stacked at site. | 45.46 | cum | 1,526.4 | ₹69,390.14 |
| 5 | Ordinary Cement concrete ( mix 1:1.5:3) with graded stone chips ( 20 mm nominal size) excluding shuttering and einforcement if any in ground floor as per relevant IS codes. (ii) River Bazree | 125.49 | cum | 7,238.4 | ₹9,08,346.82 |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.(a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.Others | 8.65 | MT | 77,113.2 | ₹6,67,029.18 |
| 7 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams,columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor) (a)25mmto30mm thick wooden shuttering as per decision & direction of the Engineer-in -charge. | 741.46 | Sqm | 334 | ₹2,47,647.64 |
| 8 | Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
(i) (1:3:6) proportion | 50.38 | cum | 3,964.8 | ₹1,99,746.62 |
| 9 | 125 mm thick brick work with 1st class brick's in Cement mortar (4:1) in ground floor. | 222.71 | Sqm | 1,038 | ₹2,31,172.98 |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar, including rounding off corners or chamfering corners as directed and recking out joints or roughening of concrete surface. a) with (4:1) cement mortor (a)20mm thick plaster | 828.62 | Sqm | 247.2 | ₹2,04,834.86 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_2444743.xls
BOQ • 0.34 MB
TenderForm5.pdf
Tender Documents • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .