| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAdmitted-Finance | ₹3.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.4 Cr+₹19.9 L (6.20%)Admitted-Finance | ₹3.4 Cr+₹19.9 L (6.20%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Nirman Construction L1 | Dadasaheb Bapusaheb Gunjate L2 |
|---|---|---|---|---|---|
| 1.00 | BITUMINOUS MACADAM: Proving and laying bituminous macadam using crushed aggregates of Grading 2, premixed with bituminous binder, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with 3.4 % VG-40 Bitumen including tack coat at the rate of 3 kilogramme per 10 square meter (VG-10) -- USING Batch mix type hot mix plant without SCADA, Sensor Paver, vibratory roller, Intelligent Compactor with compaction analyzer and VSat attachment.. | 203 | One Cubic Metre | - | - |
| 2.00 | DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of grading 2,premixed with bituminous binder VG-40 Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired density for 50 mm compacted thickness .USING 80 TPH Batch mix type hot mix plant without SCADA, Sensor Paver, Intelligent Compactor with compaction analyzer and V-Sat attachment with Stone Dust filler.including tack coat at the rate of 2.5 kilogramme per 10 square metre of VG-10. | 1,450 | One Cubic Metre | - | - |
| 3.00 | BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 2, premixed with bituminous binder @ 5.40 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level,alignment, and rolling to achieve the desired compaction for 30 mm compacted thickness with VG-40 Bitumen, with shreaded waste plastic 8% of bitumen - USING 80 TPH Batch mix type hot mix plant without SCADA, Sensor Paver, Intelligent Compactor with compaction analyzer and V-Sat attachment with Stone Dust filler.including tack coat at the rate of 2.5 kilogramme per 10 square metre of VG-10. | 1,914 | One Cubic Metre | - | - |
| 4.00 | Providing selected hard murum for road side widths ,including supplying hard murum and spreading etc. complete. | 1,987.2 | One Cubic Metre | - | - |
| 5.00 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. | 16,560 | One Square Metre | - | - |
| 6.00 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area,thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.complete. | 3,180 | One Square Metre | - | - |
| 7.00 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 8,000 | One Cubic Metre | - | - |
| 8.00 | Royalty Charges for Hard Murum | 1,987.2 | One Cubic Metre | - | - |
Tender Value
₹4.0 Cr
EMD Value
₹7.4 L
Closing Date
19 Mar 2020, 5:30 pmClosed
Executive Engineer, Kolhapur NH
Executive Engineer, Kolhapur NH
Periodical Renewal of Ratnagiri Tink Pali Kolhapur Miraj Sangola Solapur Road NH.166 Km.126/00 to 137/285 in the state of Maharashtra. (Waghbil Ghat End to Shivaji Bridge)
2020_MoRTH_550870_1
AB/NHDn /Tender-6/666 /2019-20
Open Tender
Civil Works - Others
EPC Contract
180 days
kolhapur
To participate for bidding bidders have to pay Rs 11800/-Tender fee Rs.10,000/- to be submitted online through the portal
bharatkosh.gov.in (receipt /document in support of online payment to be submitted
onlin
6 documents required · 6 mandatory
₹1,800
Executive Engineer
₹7.4 L
In the office of the Chief Engineer, NH, Belapur
20 Apr 2020
7 Mar 2020
24 Mar 2020
7 Mar 2020
19 Mar 2020
7 Mar 2020
12 Mar 2020
Amount
BITUMINOUS MACADAM: Proving and laying bituminous macadam using crushed aggregates of Grading 2, premixed with bituminous binder, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with 3.4 % VG-40 Bitumen including tack coat at the rate of 3 kilogramme per 10 square meter (VG-10) -- USING Batch mix type hot mix plant without SCADA, Sensor Paver, vibratory roller, Intelligent Compactor with compaction analyzer and VSat attachment..
DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of grading 2,premixed with bituminous binder VG-40 Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired density for 50 mm compacted thickness .USING 80 TPH Batch mix type hot mix plant without SCADA, Sensor Paver, Intelligent Compactor with compaction analyzer and V-Sat attachment with Stone Dust filler.including tack coat at the rate of 2.5 kilogramme per 10 square metre of VG-10.
BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 2, premixed with bituminous binder @ 5.40 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level,alignment, and rolling to achieve the desired compaction for 30 mm compacted thickness with VG-40 Bitumen, with shreaded waste plastic 8% of bitumen - USING 80 TPH Batch mix type hot mix plant without SCADA, Sensor Paver, Intelligent Compactor with compaction analyzer and V-Sat attachment with Stone Dust filler.including tack coat at the rate of 2.5 kilogramme per 10 square metre of VG-10.
Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete.
Road Marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area,thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.complete.
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils.
Royalty Charges for Hard Murum
Dadasaheb Bapusaheb Gunjate
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .