Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD was not in proper form |
Tender Value
Refer Docs
Closing Date
1 Oct 2025, 12:00 pmClosed
EE(UD)-cum-Member Secy.
O/o the EE(UD)-cum-Member Secy., DUDA, Bomdila
Removal of Legacy Waste through Bioremediation and Bio-Mining Process to Reclaim the Existing Dump Yard situated at 6th Mile Bomdila on Design, Building, Finance, Own and Operate Model
2025_APUDH_2781_1
EE/BUD/MSW-23(Pt III)/2024-25
Open Tender
Solid Waste Management
Turn-key
180 days
Bomdila
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
DC-cum-Chairman, DUDA, Bomdila
DUDA, Bomdila
3 Oct 2025
24 Sept 2025
3 Oct 2025
24 Sept 2025
1 Oct 2025
24 Sept 2025
29 Sept 2025
Amount
Removal of Legacy Waste
Reclamation of existing dumpsite through Bio-Mining process by Excavating the existing mixed compacted Garbage which Underwent biological degradation in land portion earmarked by municipality and loosening the garbage,sparying consortium of Micro organizing to sanitize and stabilize the loosened material and helping them for stabilization controlling malodors by spraying of suitable microbial in column, sieving them after stabilization by using mechanical sieving machine or any other equipment at the cost of Bidder Adopting eco friendly and Nan polluting process in order to reduce the impact of dumping site in the adjacent area. Further segregating the excavated garbage into as categories as possible for the cost of Bidder include cost of Bidder's risk and cost for sieving the excavated garbage storing the segregated materials. Deployment of necessary man power materials equipment tool and construction of plant and sheds and creation of facilities for handing separation, segregating and storing for the operation of the plant. Levelling the earth surfaces by bull dozer or any other earth moving equipment. Providing security arrangements for the plan project. Site, machineries equipment etc. At the cost of Bidder competing the work within the contract period a directed by the Departmental officers. The entire segregated materials all be soild/disposed within fifteen days. The bidder should maintain the ambient air quality within the standard prescribed and the activities should not attract any public complaints
stage.html
html • 0.02 MB
finance_2969.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .