| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | S.SEKHAR L1 |
|---|---|---|---|---|
| 1.00Civil works | ||||
| 1.01 | Excavation of 8m pole pit on Rocky ground (Hard soil) (1.25m * 0.5m*1.5m) | 2 | Per pit | 1,500 ₹1,770 Lowest |
| 2.01 | Erection of 8m pole | 2 | Per pole | 1,100 ₹1,298 Lowest |
| 3.01 | Loading and Unloading of 8m PSC pole | 2 | Per pole | 800 ₹944 Lowest |
| 4.01 | Transporting of 8m poles from road side to pole pit upto 2 KM | 2 | Per pole | 1,200 ₹1,416 Lowest |
| 5.01 | Fixing of HT Pin Insulator | 21 | Per | 2,100 ₹2,478 Lowest |
| 6.01 | Fixing of LT Pin Insulator | 34 | Per | 2,550 ₹3,009 Lowest |
| 7.01 | Fixing of 11 KV Disc | 27 | Per | 5,400 ₹6,372 Lowest |
| 8.01 | Fixing of LT Shackle Insulator | 53 | Per | 3,975 ₹4,690.5 Lowest |
| 9.01 | Fixing of Aluminium Knob | 10 | Per | 500 ₹590 Lowest |
Tender Value
Refer Docs
EMD Value
₹2,990
Closing Date
13 Jan 2026, 2:00 pmClosed
EE/D/KZI
EE/D/KZI
EE/D/KZI/ETW-45/25-26/29.12.25
2026_EB_638478_1
EE/D/KZI/ETW-45/25-26/29.12.25
Open Tender
Electrical Works
Works
120 days
EE/D/KZI
As per Spec
3 documents required · 3 mandatory
₹0
₹2,990
Yes
26 Feb 2026
2 Jan 2026
14 Jan 2026
2 Jan 2026
13 Jan 2026
2 Jan 2026
2 Jan 2026 - 13 Jan 2026
Excavation of 8m pole pit on Rocky ground (Hard soil) (1.25m * 0.5m*1.5m)
Erection of 8m pole
Loading and Unloading of 8m PSC pole
Transporting of 8m poles from road side to pole pit upto 2 KM
Fixing of HT Pin Insulator
Fixing of LT Pin Insulator
Fixing of 11 KV Disc
Fixing of LT Shackle Insulator
Fixing of Aluminium Knob
Fixing of LT Single phase cross arm
Fixing of LT Three phase cross arm
Fixing of V cross arm 3 1/2'
Fixing of HT/LT TI fitting
Fixing of Tapping Channel cross arm 3 1/2'
Excavation of Stay pit on Rocky ground (Hard soil) (1.00m * 0.5m*1.5m)
Erection of Stay set
Dismantling & Re-Fixing of Street light switching point arrangement
Street light switching point arrangement withwire and switch including B type MS Box with painting
Erection of HT 11 KV Lines Stringing, Sagging, Binding for 7/4.09 ACSR Pin point
Erection of LT Lines Stringing, Sagging, Binding for 7/3.35 ACSR & 7/3.15 AAAC Pin point
Erection of LT Lines Stringing, Sagging, Binding for 7/2.59 ACSR & 7/2.50 AAAC Pin point
Dismantling & Re-Erection of HT 11 KV Lines Stringing, Sagging, Binding for 7/4.09 ACSR Pin point
Dismantling & Re-Erection of HT 11 KV Lines Stringing, Sagging, Binding for 7/3.15 and 7/3.35 ACSR Cut point
Dismantling & Re-Erection of LT Lines Stringing, Sagging, Binding for 7/2.59 ACSR & 7/2.50 AAAC Pin point
Loading & Unloading of line materials
Annexure – III -I (Erection of Single pole Transformer structure without center support)
Annexure – III -II (Erection of Single pole Transformer structure with center support)
Annexure – III -II (Erection of Single pole Transformer structure with center support)
Fabrication and Erection of Concrete Ring
Coping of Structure pole
Loadind & un loading of Distribution Transformer Below 250 KVA
Set right of leaning of LT pole including x arms, TI fittings
Drilling / Less than 23mm holes per hole / slotted holes
For Ordinary. Tree clearance in HT or LT and Throne bushes & trees
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 0.17 MB
BOQ_764137.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .