Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
14 Dec 2020, 2:00 pmClosed
SUPERINTENDING ENGINEER
33/11KV SUB STATION PURANIA ALIGANJ LUCKNOW
Testing of protective system of power transformer, 11 KV switchgear and 33 KV control panels installed at various 33/11 KV S/S, in the area of E.E. EUTD IVth and Xth, Under the jurisdiction of EUDC-Xth, LESA,Trans Gomti, Lucknow.
2020_MVVNL_528315_2
63/EUDC-X/2020-21
Open Tender
Electrical Works
Lump-sum
365 days
EUTD-X AND ETD-IV LESA LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE EDD BKT LESA LUCKNOW
₹5,000
23 Dec 2020
8 Dec 2020
15 Dec 2020
8 Dec 2020
14 Dec 2020
8 Dec 2020
Amount
Testing of Power Transformer and earth resistive test under the area of EUDD-Daliganj/Rahim Nagar/B.K.T. at various 33/11 KV S/S voltage ratio testing at normal tap, oil test, magnetic balance at normal tab, oil test megar result calibration of WTI and OTI meter and earthing resistive test and other testing if any required and testing of 33/11 KV Power Trnasformer panel marshalling box & braker by primary injection method temperature, oil temperature, oil level indicator, buchholz relay, surge relay for alarm, tripping testing of relay.
Testing of 11 KV Panels & relay, 11 KV VCB/OCB (all make), setting of relay to avoid time over lapping, rectifying the faults in VCB/OCB for proper tripping, testing the healthyness of control ckt and replacing the damaged control ckt, ensuring complete and smooth operation of breakers, checking the healthyness of earthing of panels, testing proper buchholz operation, checking the healthyness of transformer (power) earthing (both neutral & body). Contractor will rectify the faults in tripping ckt, testing and repairing of panels, control ckt and relays all works will have one year warranty. During warranty period if any problem appears in tripping/protection ckt, contractor will rectified it. Major spare parts of VCB & relay will be provided by department (if replacement is required). Petty item like nuts, and bolts, greasing etc. will be provided by the contractor.
NATIONAL CONTRACTOR & GENERAL ORDER SUPPLIER
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .