Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-Finance 117 2 KAKA DEV KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | L1 | Accepted-Finance Agreement With L1 | |
| 2 | L2₹8.0 L+₹45,663.86 (6.05%)Rejected-Finance 00 BALIHAWAN DEH MAFI BALIHAWAN DEH MAFI KAUSHAMBI KAUSHAMBI UTTAR PRADESH 212202 | KAUSHAMBI | UTTAR PRADESH | 212202 | L2 | Rejected-Finance Agreement With L1 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S RAJ ENTERPRISES L2 | OM SAI CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling R.B. or R.C.C. work including stacking of material within 60 Meters. | 0.66 | M3 | 540 ₹356.4 Lowest | 700 ₹462 |
| 2.00 | Dismantling brick or stone masonary in lime or cement including stacking of material with in 60 meters. | 1.44 | M3 | 500 ₹720 Lowest | 700 ₹1,008 |
| 3.00 | Earth work in foundation in dry ordinary soil (loam clay or sand) including lift upto 1.50M and lead upto 30M and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation trenches. | 91.29 | M3 | 98 ₹8,946.71 | 80 ₹7,303.44 Lowest |
| 4.00 | Laying C.C. 1:3:6 with cement, coarse sand & aggregate (22.50-45.00)mm i/c all cost of material, labour T&P etc comp. (Per CuM.) | 21.8 | M3 | 5,120 ₹1,11,605.76 | 3,400 ₹74,113.2 Lowest |
| 5.00 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours per CuM. | 69.61 | M3 | 4,819 ₹3,35,455.41 Lowest | 5,300 ₹3,68,938.3 |
| 6.00 | Providing & laying C.C. 1:1.5:3 with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete (Per CuM.) | 3.02 | M3 | 5,944 ₹17,950.88 | 5,200 ₹15,704 Lowest |
| 7.00 | Providing & laying R.C.C. 1:1.5:3 with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete and also excluding centering and shuttering and reinforcement (Per CuM.) | 9.23 | M3 | 6,492.5 ₹59,899.81 | 5,200 ₹47,975.2 Lowest |
| 8.00 | Providing & fixing Steel Reinforcement including cost of steel, binding wire, bending, binding welding, cutting, placing in proper position i/c all cost of material, labour, T&P etc. complete (per M.T.) | 1.08 | M.T. | 66,100 ₹71,652.4 Lowest | 72,000 ₹78,048 |
| 9.00 | Centering and shuttering in straight portion of C.C. Pier and abutment. (Per Sqm) | 48.24 | M2 | 490 ₹23,639.07 | 400 ₹19,297.2 Lowest |
| 10.00 | Providing Cement pointing (Struck Deep) on brick masonary in 1:3 Cement Mortar including cost of all material, T&P and labour per SqM. | 145.88 | M2 | 123.5 ₹18,016.3 Lowest | 200 ₹29,176.2 |
Tender Value
₹9.4 L
EMD Value
₹18,800
Closing Date
15 Sept 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-06-EE-2026-27 Reconstruction work of the damaged bridge located at Km 11.275 of Bahadurgarh canal. Lot No-06
2026_UPIDC_1181263_6
TN-06/EE/2026-27
Open Tender
Civil Works
Piece-work
90 days
As Per NIT
As Per NIT and TD
3 documents required · 3 mandatory
₹944
₹18,800
30 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling R.B. or R.C.C. work including stacking of material within 60 Meters. | - | M3 | - | - |
| 2 | Dismantling brick or stone masonary in lime or cement including stacking of material with in 60 meters. | 1 | M3 | - | - |
| 3 | Earth work in foundation in dry ordinary soil (loam clay or sand) including lift upto 1.50M and lead upto 30M and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation trenches. | 0.2 | M3 | - | - |
| 4 | Laying C.C. 1:3:6 with cement, coarse sand & aggregate (22.50-45.00)mm i/c all cost of material, labour T&P etc comp. (Per CuM.) | 1 | M3 | - | - |
| 5 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours per CuM. | 0.4 | M3 | - | - |
| 6 | Providing & laying C.C. 1:1.5:3 with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete (Per CuM.) | - | M3 | - | - |
| 7 | Providing & laying R.C.C. 1:1.5:3 with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete and also excluding centering and shuttering and reinforcement (Per CuM.) | - | M3 | - | - |
| 8 | Providing & fixing Steel Reinforcement including cost of steel, binding wire, bending, binding welding, cutting, placing in proper position i/c all cost of material, labour, T&P etc. complete (per M.T.) | - | M.T. | - | - |
| 9 | Centering and shuttering in straight portion of C.C. Pier and abutment. (Per Sqm) | - | M2 | - | - |
| 10 | Providing Cement pointing (Struck Deep) on brick masonary in 1:3 Cement Mortar including cost of all material, T&P and labour per SqM. | 0.4 | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.47 MB
Tendernotice_2.pdf
PDF • 1.99 MB
BOQ_2220861.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .