| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 CrAdmitted-Finance E 28 PHASE 2 INDRA NAGAR JHLANA DUNGRI JAIPUR 302004 | JAIPUR | RAJASTHAN | 302004 | -15.86% | ₹3.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.6 Cr+₹13.5 L (3.90%)Admitted-Finance | -12.58% | ₹3.6 Cr+₹13.5 L (3.90%) | L2 | Admitted-Finance |
| 3 | L3₹3.7 Cr+₹23.7 L (6.83%)Admitted-Finance | -10.11% | ₹3.7 Cr+₹23.7 L (6.83%) | L3 | Admitted-Finance |
| 4 | L4₹3.9 Cr+₹40.7 L (11.7%)Admitted-Finance | -5.99% | ₹3.9 Cr+₹40.7 L (11.7%) | L4 | Admitted-Finance |
| 5 | L5₹3.9 Cr+₹45.6 L (13.1%)Admitted-Finance | -4.81% | ₹3.9 Cr+₹45.6 L (13.1%) | L5 | Admitted-Finance |
Tender Value
₹4.1 Cr
EMD Value
₹8.3 L
Closing Date
3 Jun 2026, 6:00 pmClosed
Superintending Engineer
RSAMB Circle Jaipur
Const. of Govt. Girls College at Kotkhawda, Distt. Jaipur
2026_RSAMB_559909_2
RSAMB/Circle Jaipur/NIT-01/2026-27
Open Tender
Civil Works
Percentage
Jaipur
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
EE RSAMB Division-II Jaipur
₹8.3 L
Yes
22 Jun 2026
16 May 2026
5 Jun 2026
16 May 2026
3 Jun 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A-Building Work | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils. | 1,798 | Cum | 178 | ₹3,20,044 |
| 3 | Supplying and Filling in plinth with blown sand under floors including watering ramming consolidating and dressing complete including cost of sand. | 536 | Cum | 450 | ₹2,41,200 |
| 4 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr. : All kinds of soil. | 2,250 | Sqm | 9 | ₹20,250 |
| 5 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 358 | Cum | 3,847 | ₹13,77,226 |
| 6 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix. | 411 | Cum | 4,934 | ₹20,27,874 |
| 7 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.M20 grade Nominal Mix / Design Mix. | 90 | Cum | 5,609 | ₹5,04,810 |
| 8 | Providing and laying in position Ready mix concrete manufactured in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design of specified grade of RCC work including pumping of R.M.C. from transit mixer to site of laying , exculding the cost of centering, shuttering and reinforcement with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. All works upto floor V floor M20 grade Design Mix by using cement as per codal provision. | 555 | Cum | 6,089 | ₹33,79,395 |
| 9 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Arches, arch ribs, domes, vaults, shells, folded plate, chimneys, shafts , roofs having slope more than 15º ,vertical and horizontal fins individually or forming box louvers, facias and eaves boards M20 grade Nominal Mix / Design Mix | 8 | Cum | 5,561 | ₹44,488 |
| 10 | Add extra for providing richer mixes respectively at all floor levels, Providing M-25 grade concrete by using cement as per codal provision instead of M-20 grade design mix. | 1,063 | Cum | 69 | ₹73,347 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.84 MB
Tendernotice_2.pdf
PDF • 0.49 MB
Tendernotice_3.pdf
PDF • 0.34 MB
Tendernotice_4.pdf
PDF • 0.12 MB
Tendernotice_5.pdf
PDF • 0.43 MB
Tendernotice_6.pdf
PDF • 1.45 MB
Tendernotice_7.pdf
PDF • 0.61 MB
Tech-Bid-Kotkhawda.pdf
Tender Documents • 0.89 MB
Bid-Doc-Kotkhawda.pdf
Tender Documents • 0.54 MB
BOQ_996753.xls
BOQ • 0.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .