Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households in Reddipalayam and Vilangudi Village Panchayats in Ariyalur Panchayat Union in Ariyalur District for the year 2020-21 in Package No TN 30-19
2020_RDTN_173377_1
2052/2020/A7,Dated.15.07.2020
Open Tender
Civil Works - Water Works
Works
180 days
DRDA
As per Tender Document
4 documents required · 4 mandatory
₹0
₹1 L
DRDA, Ariyalur
21 Aug 2020
25 Jul 2020
5 Aug 2020
25 Jul 2020
5 Aug 2020
25 Jul 2020
27 Jul 2020
Amount
1.Providing 199 FHTC to Reddipalayam Habitation of Reddipalayam Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Name Board Charges
2.Providing Pipeline (Distribution) to Reddipalayam Habitation of Reddipalayam Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
3.Providing 70 FHTC to Mailandakottai Habitation of Reddipalayam Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Name Board Charges
4.Providing Pipeline (Distribution) to Mailandakottai Habitation of Reddipalayam Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Name Board Charges
5.Providing 65 FHTC to chandrapalayam Habitation of Reddipalayam Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Name Board Charges
6.Providing Pipeline (Distribution) to chandrapalayam Habitation of Reddipalayam Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
7.Providing 163 FHTC to V.Kaikatti Habitation of Reddipalayam Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Name Board Charges
8.Providing Pipeline (Distribution) to V.Kaikatti Habitation of Reddipalayam Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
9.Providing 70 FHTC to Puthur Habitation of Reddipalayam Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Name Board Charges
10.Providing Pipeline (Distribution) to Puthur Habitation of Reddipalayam Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
11.Providing 221 FHTC to Muniyankurichi Habitation of Reddipalayam Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Name Board Charges
12.Providing Pipeline (Distribution) to Muniyankurichi Habitation of Reddipalayam Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
13.Providing 104 FHTC to Nayakarpalayam Habitation of Reddipalayam Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Name Board Charges
14.Providing Pipeline (Distribution) to Nayakarpalayam Habitation of Reddipalayam Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
15.Providing 484FHTC to Vilangudi Habitation of Vilangudi Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Name Board Charges
16.Providing Pipeline (Distribution) to Vilangudi Habitation of Vilangudi Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
17.Providing 120 FHTC to Orathur Habitation of Vilangudi Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Name Board Charges
18.Providing Pipeline (Distribution) to Orathur Habitation of Vilangudi Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
19.Providing 66FHTC to Keelavilangudi Habitation of Vilangudi Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Name Board Charges
20.Providing Pipeline (Distribution) toKeelavilangudi Habitation of Vilangudi Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
natarajan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .