Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹44.0 L
EMD Value
₹44,000
Closing Date
16 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA
DRDA, Collectorate Campus, Vengikkal, Tiruvannamalai
Providing Infrastructure Development works to AGAMT 2021-22 Village Panchayat at Vinnamangalam Panchayat of Cheyyar Block in Package No. TVM/2021-22/163 Tiruvannamalai District
2022_RDTN_239965_1
Roc.No.1250/2022/A13 Dt.22.06.2022 163
Open Tender
Civil Works
Lump-sum
180 days
cheyyar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹44,000
Yes
24 Aug 2022
7 Jul 2022
16 Aug 2022
7 Jul 2022
16 Aug 2022
7 Jul 2022
Amount
Part I : Reconstruction of Sluice and weir in Melmattai Vinnamangalam Eri Panchayat.
Sulice & Wier :Clearing Scrub Jungle with uprooting as per standard specification
DiSmantling damaged Brick /Stone masonry walls including all labour Charges etc.,
DiSmantling damaged Cut Stone including all labour Charges etc complete
DiSmantling damaged Front Plain Cement Concrete including all labour Charges etc complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
base course concrete with C.C.1:4:8 using 40mm I.S.S. size HBG metal from approved quarry to site including cost and conveyance of all materials and labour charges
Cemnt conrete with C.C.1:2:4 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.
C.C. 1:3:6mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
C.C. 1:1:5:3 HBG Metal from approved quarry to work site inculding cost and conveyance of all materials and labour charges for mixing, laying compacting, etc,complete
Supplying, fabrication and placing in position mila steel or ribbed for all reinforced cement concrete works as per the design
R.C.C. 1:1:5:3 HBG Metal from approved quarry to work site inculding cost and conveyance of all materials and labour charges for mixing, laying compacting, etc,complete
Supply and fixing Cut stone Roughly Dressed to size all Faces and set in cm 1:3 mix etc Complete.
Re filling with ecavated earth in foundation and basement with filling sand complete complying with standard specification.
Rogh stone dry Packing for aprons and revetments including cost and conveuance and all labour charges etc. complete for 10 cum
Fabricating supplying and fixing of screw gearing wooden plug.
Part II : Rejuvenation of Kullan Kulam ( Bhathing ghat,Inlet and outlet) @ Melmattai in vinnamangalam panchyat
Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Desilting :Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete Having width of 3.0-10.0m
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Construction of Bhathing Ghat :Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Construction of Baby Pond Lining wall Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
INLET : Earthwork excavation in all classes of soil as per SS 20A
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Part III :Providing Paver Block Road in Yadavar Street @ Vinnamangalam Panchayat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III
Flooring with paver block 60 mm thickness laid over, interlocking blocks including cost and conveyance and all labour charges for 10 m2
Part IV :Providing Paver Block Road in Balagandaputhur Ist Street @ Vinnamangalam Panchayat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III
Flooring with paver block 60 mm thickness laid over, interlocking blocks including cost and conveyance and all labour charges for 10 m2
Part V : Providing Paver Block Road in Balagandaputhur II Street @ Vinnamangalam Panchayat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III
Flooring with paver block 60 mm thickness laid over, interlocking blocks including cost and conveyance and all labour charges for 10 m2
Part VI : Construction of Girls Toilet in Vinnamangalam PUElementry School at Vinnamangalam Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation etc complete
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supply Filling in foundation and basement with excaveted earth including cost and conveyance of all materials to site and all labour charges etc complete
Supply Filling in foundation and basement with excaveted earth including cost and conveyance of all materials to site and all labour charges etc complete
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Honey Comb Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Brick Jeiiy 40mm filling soak pit including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete - Above GL
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Granoflooring including cost and conveyance of all materials to site and all labour charges etc complete.
Special Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2 20mm thick and pointing with white cement 0.4kg/sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joint neatly complying with std specification
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Labour charges for Fixing Door & Window
Supplying and fixing in position best quality Wash Basine
Supplying and fixing of 500lit HDPE Tank
Provision for Mirror PVC/fiber glass framed
Steel Door -D1 0.75.X1.80
Provision for Rcc Jolly
Provision for Leach Pit
Provision for water Closet
Provision for water EWC
Provision for Water supply Arrangements
25mm PVC pipe
25mm PVC Elbow
25mm PVC Coupling
32mm PVC Pipe
63mm PVC pipe
63mm PVC Elbow
63mm PVC Coupling
25mm GM Gate valve
Earth work excavation in Hard stiff gravely soil for narrow foundation with initial lead and lift as per SS 20 B,etc complete
Towards Labour Charges for Laying of Pvc Pipes and specials including all labour charges etc complete.
Refilling the excavated earth to the Pipe line trench including all labour charges etc complete.
Provision for Lite Roofing Arrangements
Lite Roofing
Iron work MS Pipes
Part VII : Construction of Girls Toilet in Balagandaputhur PUES at Vinnamangalam Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation etc complete
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supply Filling in foundation and basement with excaveted earth including cost and conveyance of all materials to site and all labour charges etc complete
Supply Filling in foundation and basement with excaveted earth including cost and conveyance of all materials to site and all labour charges etc complete
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Honey Comb Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Brick Jeiiy 40mm filling soak pit including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete - Above GL
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Granoflooring including cost and conveyance of all materials to site and all labour charges etc complete.
Special Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2 20mm thick and pointing with white cement 0.4kg/sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joint neatly complying with std specification
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Labour charges for Fixing Door & Window
Supplying and fixing in position best quality Wash Basine
Supplying and fixing of 500lit HDPE Tank
Provision for Mirror PVC/fiber glass framed
Steel Door -D1 0.75.X1.80
Provision for Rcc Jolly
Provision for Rcc Leach Pit
Provision for water Closet
Provision for water EWC
Provision for Water supply Arrangements
25mm PVC pipe
25mm PVC Elbow
25mm PVC Coupling
32mm PVC Pipe
63mm PVC pipe
63mm PVC Elbow
63mm PVC Coupling
25mm GM Gate valve
Earth work excavation in Hard stiff gravely soil for narrow foundation with initial lead and lift as per SS 20 B,etc complete
Towards Labour Charges for Laying of Pvc Pipes and specials including all labour charges etc complete.
Refilling the excavated earth to the Pipe line trench including all labour charges etc complete.
Provision for Lite Roofing Arrangements
Lite Roofing
Iron work MS Pipes
Part VIII : Construction of Threashing Floor @ Vinnamangalam Panchayat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Supply Filling in foundation and basement with Filling Sand including cost and conveyance of all materials to site and all labour charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
C.C. 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Bittuman Pad
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sankar N
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .