Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | ₹15.6 L Quoted ₹15.7 L | L1 | Accepted-AOC L-1 |
| 2 | L2₹16.0 L+₹31,365.83 (2.00%)Rejected-Finance SANTOKHGARH DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | ₹16.0 L+₹31,365.83 (2.00%) | L2 | Rejected-Finance Bid Rejected due to higher side rates. |
| 3 | L3₹16.1 L+₹46,301.94 (2.96%)Rejected-Finance IND AREA ROAD TAHLIWALA TEH HAROLI DISTT UNA H P | TAHLIWALA | UNA | HIMACHAL PRADESH | ₹16.1 L+₹46,301.94 (2.96%) | L3 | Rejected-Finance Bid Rejected due to higher side rates. |
Tender Value
₹14.9 L
EMD Value
₹14,936
Closing Date
27 Mar 2026, 1:50 pmClosed
Sr.Xen
Er.Rahul Puri Sr. Executive Engineer, Electrical Division, HPSEBL Haroli
HED/422/2025-26
2026_HPSEB_131983_1
NO/HED-422/2025-26
Open Tender
Electrical Works
Percentage
90 days
ED Haroli
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹14,936
7 Apr 2026
19 Mar 2026
27 Mar 2026
19 Mar 2026
27 Mar 2026
19 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Erection Part of 11/0.4 KV, 100 KVA Transformer (T.S no /2025-26) | - | - | - | - |
| 1.02 | Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. (100 KVA Transformer) | - | Job | - | - |
| 1.03 | Transportation and Loading of materials sub-station materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage. | 1 | Job | - | - |
| 1.04 | Supply Part of 11/0.4 KV, 100 KVA Transformer 195/2024-25 | - | - | - | - |
| 1.05 | Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA | 1 | No | - | - |
| 1.06 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) Prov By HPSEBL 2nos | - | - | - | - |
| 1.07 | Prov. RCC Muff | 2 | Each | - | - |
| 1.08 | Prov. concrete filling in RCC muff | - | Job | - | - |
| 1.09 | Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line | 2 | No. | - | - |
| 1.1 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA. | 1 | No. | - | - |
stage.html
html • 0.05 MB
technical_195161.pdf
techsummary_195161.pdf
finance_195161.pdf
BOQ Comparative Chart
xlsx
finsummary_195161.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
additionaltermandcondition.pdf
Additional Documents • 0.39 MB
BOQ_195161.xls
BOQ • 0.95 MB
termandcondition.pdf
Tender Documents • 0.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .