| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
2 May 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer ED Anantnag
office of the Executive Engineer ED Anantnag
Execution for loading unloading dragging of damaged transformers and other store related items for the year 2022-23
2022_PDD_166387_1
e-NIT No 003/EDA of2022-23 Dated 09-4-2022
Open Tender
Electrical Works
Turn-key
20 days
Anantnag
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Executive Engineer ED Anantnag
Exempted
office of the Executive Engineer ED Anantnag
3 May 2022
11 Apr 2022
3 May 2022
11 Apr 2022
2 May 2022
11 Apr 2022
11 Apr 2022 - 2 May 2022
13 Apr 2022
120 days
Amount
Loading of 25KVA/63 KVA Distribution Transformer
Loading of 100 KVA Distribution Transformer
Loading of 250 KVA Distribution Transformer
Loading of 400 KVA Distribution Transformer
Loading of 500 KVA Distribution Transformer
Loading of 630 KVA Distribution Transformer
Unloading of 25/63 KVA Distribution Transformer
Unloading of 100 KVA Distribution Transformer
Unloading of 250 KVA Distribution Transformer
Unloading of 400 KVA Distribution Transformer
Unloading of 500 KVA Distribution Transformer
Unloading of 630KVA Distribution Transformer
Dragging of 25/63 KVA Distribution Transformer upto lead of 50 Mtr
Dragging of 100 KVA Distribution Transformer upto lead of 50 Mtr
Dragging of 250 KVA Distribution Transformer upto lead of 50 Mtr
Dragging of 400 KVA Distribution Transformer upto lead of 50 Mtr
Dragging of 500 KVA Distribution Transformer upto lead of 50 Mtr
Dragging of 630 KVA Distribution Transformer upto lead of 50 Mtr
Opening of 25/63 KVA Distribution Transformer
Opening of 100 KVA Distribution Transformer
Opening of 250 KVA Distribution Transformer
Opening of 400 KVA Distribution Transformer
Opening of 500 KVA Distribution Transformer
Opening of 630 KVA Distribution Transformer
Assembling of 25/63 KVA Distribution Transformer
Assembling of 100 KVA Distribution Transformer
Assembling of 250 KVA Distribution Transformer
Assembling of 400 KVA Distribution Transformer
Assembling of 500 KVA Distribution Transformer
Assembling of 630 KVA Distribution Transformer
Replacement of Bush Rods of 25/63 KVA Distribution Transformers
Replacement of Bush Rods of 100 KVA Distribution Transformers
Replacement of Bush Rods of 250 KVA Distribution Transformers
Replacement of Bush Rods of 400 KVA Distribution Transformers
Replacement of Bush Rods of 500 KVA Distribution Transformers
Replacement of Bush Rods of 630 KVA Distribution Transformers
Over Halling of Existing Filtrartion Plant
Over Halling of Existing Electric Oven
Over Halling of Compress Pump
Filitration of Transformer Oil
Hire Charges of 500 Gallion filitration Plant
Installation ,Testing and commissioning of LT Single Phase Meter
Installation ,Testing and commissioning of LT 3 Phase Meter
Installation ,Testing and commissioning of LT 3Phase Prodjey Meter
Sealing of single phase meter
Un-Loading of ST Poles 11 Mtr Long in Divisional Stores
Un-Loading of ST Poles 9 Mtr Long in Divisional Stores
Un-Loading of ST Poles 8 Mtr Long in Divisional Stores
Loading of ST Poles 8 Mtr Long in Divisional Stores
Loading of ST Poles 9 Mtr Long in Divisional Stores
Loading of ST Poles 11 Mtr Long in Divisional Stores
Dragging of ST Poles 11 Mtr Long upto lead of 50 Mtr
Dragging of ST Poles 9 Mtr Long upto lead of 50 Mtr
Dragging of ST Poles 8 Mtr Long upto lead of 50 Mtr
Un- Loading of line material and workshop material like ACSR (30 mmsq/50mm sq/100 mm sq) ,Cable off sizes,DPC, T-Oil(Barrels) GI wire, Link Sets, DO Sets,Braces off sizes, Bush Rods, ''AL" Strips, insulators etc at Divisional Stores
Loading of line material and workshop material like ACSR (30 mmsq/50mm sq/100 mm sq), Cable off sizes,DPC, T-Oil(Barrels) GI wire, Link Sets, DO Sets,Braces off sizes, Bush Rods, ''AL" Strips, insulators etc at Divisional Stores
ZULFKAR ELECTRICALS
M/S SHAH ELECTRIC
AB HAMEED ITOO
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .