Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹6,510
Closing Date
8 Jul 2026, 2:00 pm
Similar tender results from the same govt authority in the past 3 years.
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
Extension of Battery Room in Existing Poonamallee CMRL 110kV Substation
2026_EB_682708_1
OT-07/2026-27 of SE/GCC-II
Open Tender
Electrical Works
120 days
Poonamallee
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹6,510
Yes
24 Jun 2026
24 Jun 2026
9 Jul 2026
24 Jun 2026
8 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Removing the black topping of any thickness at road crossing 60cm wide and 200cm deep (clear) including cost of providing sign boards, danger lights, indication arrangements wherever necessary, lead, lift, labour, tools & plants, etc., compete. | 1 | Cum | - | - | item01 |
| 2 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete. | 28.06 | cum | - | - | item02 |
| 3 | Supplying and filling with good river sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. | 1.87 | cum | - | - | item03 |
| 4PCC 1:3:6, with 20 to 40mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | ||||||
| 5 | Providing RCC 1:1.5:3 raft using 20 mm HBG metal with out form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects | 7.18 | cum | - | - | item05 |
| 6 | Providing RCC 1:1.5:3 using 20 mm HBG metal with form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects | 5.8 | cum | - | - | item06 |
| 7 | Supplying, fabricating and placing in position of steel reinforcements including cost of steel,binding wire, labour, lead, lift etc complete as per standard specification and as directed by the dept. Engineer at site | 0.83 | MT | - | - | item07 |
| 8 | Supplying and spreading of well gravel for low lying area including cost of well gravel, labour for consolidation, lead, lift, etc. complete. | 7.94 | cum | - | - | item08 |
| 9 | Brick work in CM 1:5 using II class bricks of size 9" x 4 3/8" x 2 3/4 " including cost of all material, lead, lift, labour, etc, complete. | 2.65 | cum | - | - | item09 |
| 10 | Brick work in CM 1:6 using II class bricks of size 9" x 4 3/8" x 2 3/4 " including cost of all material, lead, lift, labour, etc, complete. | 8.61 | cum | - | - | item10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_820681.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid