Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.3 LAccepted-AOC PROP UMA SHARMA R O VILL DHABRIANA P O LOHARARA TEHSIL BARSAR DISTT HAMIRPUR H P | HAMIRPUR | HIMACHAL PRADESH | 174304 | ₹7.3 L Quoted ₹8.3 L | L-1 | Accepted-AOC Being a Lowest-1 |
| 2 | L-2₹8.3 LRejected-AOC VILLAGE KOTLU P O BAHINA TEHSIL BARSAR DISTRICT HAMIRPUR H P | BAHINA | HAMIRPUR | HIMACHAL PRADESH | ₹8.3 L | L-2 | Rejected-AOC Being Lowest-2 |
| 3 | L-3₹8.4 LRejected-AOC HIMACHAL PRADESH HP | ₹8.4 L | L-3 | Rejected-AOC Being Lowest-3 |
| Sl No | Description | Qty | Unit | V.V. CONSTRUCTION CO. L1 | rohit kumar L3 | Ms Rakesh kumar L2 |
|---|---|---|---|---|---|---|
| 1.00 | Deployment of skilled/ un-skilled man power for Operation & maintenance of pumping machinery, rising main and distribution network, storage tank etc. including watch & ward of pumping machinery,all civil structures such as pump house, water storage tank, sump wells and maintenance of ornametal plants, lawns and flower beds etc. as per direction of the Engineer-in-Charge. SCOPE:- Civil Works - 1 No Pump House, 1 No Sump well, 1 No.Slow sand treatment unit (Raw water tank, sedimentation tank, Filter Bed & clean water tank), 3 Nos Main Storage tanks & 3 Nos. Sub Storage tank. Rising main:- 80 mm dia= 1200 Rmts, 50 mm Dia= 820 Rmts,
Distribution System:- 64225 Rmt various dia 15 mm to 65 mm dia. Pumping Machinery :-Booster stage 2x3= 6 HP, Main Stages 4x10= 40 HP.
Man Power to be Deployed:- (1) Para Fitter = 3 Nos. ( For maintain the Rising main, Gravity main and Distribution System). (2) Assistant Pump Attendant:- 3 Nos (For operating the Pumping Machinery). (3) Helper/ Beldar= 3 Nos. ( For operating the scheme).
Total : 9 Nos. | 1 | Per Job | 8,25,000 ₹8.3 L | 8,40,000 ₹8.4 L | 8,30,000 ₹8.3 L |
Tender Value
₹6.6 L
EMD Value
₹13,220
Closing Date
27 Jan 2026, 11:00 amClosed
Executive Engineer
EE JSV Division Barsar
Deployment of manpower for operation of scheme for Six Months
2026_HPIPH_126132_1
NIT No 14145-244 dated 17.01.2026
Open Tender
Civil Works
180 days
Sub Division Bhota
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
EE Barsar
₹13,220
30 Mar 2026
17 Jan 2026
27 Jan 2026
17 Jan 2026
27 Jan 2026
17 Jan 2026
Deployment of skilled/ un-skilled man power for Operation & maintenance of pumping machinery, rising main and distribution network, storage tank etc. including watch & ward of pumping machinery,all civil structures such as pump house, water storage tank, sump wells and maintenance of ornametal plants, lawns and flower beds etc. as per direction of the Engineer-in-Charge. SCOPE:- Civil Works - 1 No Pump House, 1 No Sump well, 1 No.Slow sand treatment unit (Raw water tank, sedimentation tank, Filter Bed & clean water tank), 3 Nos Main Storage tanks & 3 Nos. Sub Storage tank. Rising main:- 80 mm dia= 1200 Rmts, 50 mm Dia= 820 Rmts, Distribution System:- 64225 Rmt various dia 15 mm to 65 mm dia. Pumping Machinery :-Booster stage 2x3= 6 HP, Main Stages 4x10= 40 HP. Man Power to be Deployed:- (1) Para Fitter = 3 Nos. ( For maintain the Rising main, Gravity main and Distribution System). (2) Assistant Pump Attendant:- 3 Nos (For operating the Pumping Machinery). (3) Helper/ Beldar= 3 Nos. ( For operating the scheme). Total : 9 Nos.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
form6.pdf
Tender Documents • 0.44 MB
F8.pdf
Tender Documents • 1.20 MB
termscondition.pdf
Additional Documents • 0.40 MB
BOQ_185891.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid