Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 1 UPON 18 JAGDAMBA NAGAR FIROZABAD FIROZABAD FIROZABAD UTTAR PRADESH 283203 | FIROZABAD | UTTAR PRADESH | 283203 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
24 Sept 2020, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC FZD
SE EDC FZD
T-30
2020_DVVNL_508501_1
T-30/EDC/F
Open Tender
Electrical Works
Lump-sum
120 days
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
DVVNL AGRA
₹20,000
Yes
1 Oct 2020
5 Sept 2020
25 Sept 2020
5 Sept 2020
24 Sept 2020
5 Sept 2020
5 Sept 2020 - 24 Sept 2020
120 days
Amount
Cartage of the following material from Store Centre, Asfabad, Firozabad to dump site of work including loading and unloading at the respective ends and also including the work of dragging etc. [Distance 00.00 Km to 30.00 Km]
8.5/9 meter long PCC pole
11/13 meter long ST pole
Conductor, GI earthwire, cross arm, angle, channel, insulator other line material.
11 KV Cubical Box 15/5 Amp.
16 KVA transformer
25 KVA transformer
63 KVA transformer
100 KVA transformer
11 KV XLPE cable 3x70 mm / 3 x 120 mm/3x185/3x300 mm
Drilling of hole in channel, angle.
Painting of dropper channel, top channel, T channel and guarding angle with 2 quote of Red Oxide including the cost of paint.
Safe placement of 8.5/9 meter long PCC pole/ 11/13 meter long ST pole from dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road.
Erection and grouting of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4.
Erection of Single support of 8.5/9 meter long PCC pole including fixing of HT/LT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast.
Erection of Single support of 8.5/9 meter long PCC pole including fixing of HT/LT fittings as per RESPO norms. The support shall not be grouted in cement, sand, and brick ballast.
Erection of single support of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings
Erection of double pole structure of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings.
Construction of plinth of aforesaid newly erected 11/13 meter long ST pole as per RESPO norms in CC 1:2:4 ratio in cement, sand and stone grit duly 12 mm thick plaster in 1:4 ratio of cement and sand to give strengthening.
Grouting, fixing and nozzling of stay rod, and grouting of stay rod shall be in ratio 1:4:8 [Cement, sand and brick ballast], as per RESPO norm,
Earthing of HT support through earthing rod & and connecting it properly as per RESPO norms.
Chopping of tree branches for clearance of line
Installation of Extra “T” as per RESPO manual
Installation of following capacity transformer in proper alignment and direction as per RESPO manual including the cost of arrangement of labourer, T&P etc required for proper completion of work.
16 KVA transformer
25 KVA transformer
63 KVA transformer
100 KVA transformer
Digging, laying and back filling 3x70 / 3x120 / 3x185/ 3x300 mm XLPE cable trench as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of bricks, sand, labourer, T&P etc. required for proper completion of work.
Installation material Contractor arrange by own his coast Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer.
11 KV cross arm holding clamp with nut & bolt
11 KV U clamp with nut & bolt
11 KV F clamp with nut & bolt
Laying of 3x70 / 3x120 / 3x185 / 3x300 sqmm. XLPE cable in open and its making connection with transformer and 11 KV feeder also as per direction of supervising engineer.
Laying, stringing, sagging, binding and jumpering etc of weasel conductor as per RESPO norms.
Laying of Ariel bunch conductor cable of size 3x50 sqr. mm/ 3x95sqr mm
Laying, stringing, sagging, binding and jumpering etc of dog conductor as per RESPO norms.
Guarding of 11 KV line.
Installation of Distribution box as per RESPO manual and as per direction of supervising engineer.
Fixing of TPMO fuse set on newly erected transformers.
Installation of 11 KV Cubical Box 15/5 Amp.
Filling and fixing of cable box suitable for XLPE cable, including the cost of arrangement of labourer, T&P etc. required for proper completion of work, but the box shall be provided by the corporation free of cost, as per actual sit requirement.
M/s ARTI ELECTRICALS
M/s APOORWA ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .