Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC JAMURIA ASANSOL BARDHAMAN 713332 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713332 | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.0 L+₹62,958.43 (9.90%)Rejected-Finance J K NAGAR P O BIDHAN BAG BARDHAMAN 713337 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713337 | L2 | Rejected-Finance High Rate quoted |
Tender Value
₹6.4 L
EMD Value
₹8,000
Closing Date
26 Jan 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The General Manager
Office of the General Manager, Satgram-Sripur Area
Installation of drive head and belt line 54L in between 0 Dip to 7 Dip for depillaring of BSP-7,9,10 and 11 depillaring panel R-VI(Bogra) seam at pit no.- 03 of J.K. Nagar(R) colliery.
2024_ECL_297996_1
ECL/SSA/GM/E M/E-NIT/2023-24/339 Date 03.01.2024
Open Tender
Miscellaneous Works
Item Rate
30 days
Satgram Sripur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,000
13 Apr 2024
12 Jan 2024
29 Jan 2024
12 Jan 2024
26 Jan 2024
12 Jan 2024
12 Jan 2024 - 15 Jan 2024
Amount
Item description
Lowering of drive head and drive head frame from Pit top to Pit Bottom Unskilled -20 Skilled-01
Transportation of drive head and drive head frame from Pit bottom to 54L/ODip Unskilled -40 Skilled-04
Lowering and Transportation of discharge and loop take drum, tail and band drum and its frame from Pit Top to 54L/ODip Unskilled -27 Skilled-03
Lowering and Transportation of winch, Gear box and its bedplate from Pit Top to 54L/Odip Unskilled -28 Skilled-02
Lowering and Transportation of motor, Starter, Switch & Cable from Pit Top to 54L/Odip Unskilled -20
Installation of drive head (Centering, levelling and fitting) Unskilled-16 Skilled -04
Installation of discharge drum, loop take up and band drum, gear box, winch (Centering,levelling and fitting) Unskilled -40 Skilled -04
Transportation of Belt from 13R/28L to 54L/ODip-500metre Unskilled -22 Skilled -02
Transportation of Top Roller & Bottom Roller from 13R/28L to 54L/ODip Unskilled -25
Transportation of Bracket and Stool from 13R128L to 54L/Odip Unskilled -25
Transportation of Channel from 13R128L to 54L/ODip Unskilled -44
Structure joining from 54L/ODip to 54L/-7Dip Unskilled -35 Skilled -07
Installation of tail end drum (Centering, levelling and fitting) Unskilled -08 Skilled -02
Fitting of belt from 54L/ODip to 54L/-7Dip to start the Belt Unskilled -20 Skilled -03
Total impact of GST for the purpose of CTC
GURU PRASAD YADAV
techsummary_308661.pdf
PDF • 0.99 MB
finsummary_308661.pdf
PDF • 0.99 MB
DriveHeadJKNKazi.pdf
PDF • 0.05 MB
finance_308661.pdf
PDF • 0.10 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .