Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr Quoted ₹2.2 Cr | L1 | Accepted-AOC accepted being lowest rate |
| 2 | L2₹2.2 Cr+₹3.3 L (1.51%)Rejected-Finance HARDAHA BALUWA VARANASI CHANDAULE | ₹2.2 Cr+₹3.3 L (1.51%) | L2 | Rejected-Finance REJECTED Being HIGHER RATE |
Tender Value
₹2.2 Cr
EMD Value
₹13.2 L
Closing Date
24 Mar 2026, 12:00 pmClosed
office of the se.ayo.ambe.circle.pwd.ayodhya
office of the se.ayo.ambe.circle.pwd.ayodhya
Sarangapur Ke pass Sarda Sahayak Nahar Maholi Badagaon Dyodi Marg par 3 Gune 8 Span Ke Laghu Setu Ka Nirman Karya
2026_CEUFZ_1126385_1
1534/2com ayo-ambe-circle/2026 dt. 12.03.2026
Open Tender
Civil Works - Bridges
Percentage
360 days
office of the se.ayo.ambe.circle.pwd.ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹13.2 L
Yes
office of the se.ayo.ambe.circle.pwd.ayodhya
21 Aug 2026
17 Mar 2026
24 Mar 2026
17 Mar 2026
24 Mar 2026
17 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)For dismantling of brick work/ tiles/etc. By Mechanical Means | 493 | CUM | 450 | ₹2,21,850 |
| 2 | Earth work in excavation in trenches for foundations in ordinary soil including lift upto 1.5 m. lead upto 30m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within a distance of 30 mt | 588 | CUM | 136 | ₹79,968 |
| 3 | Cement concrete for plain concrete PCC M-15 grade in open foundation complete as per drawing and Technical Sperifications. | 66 | CUM | 8,890 | ₹5,86,740 |
| 4 | Cement concrete for plain concrete PCC M-20 grade in open foundation complete as per drawing and Technical Sperifications. | 188 | CUM | 9,371 | ₹17,61,748 |
| 5 | R.C.C. M25 grade in Foundation as per drawing and technical specification. | 2.4 | CUM | 9,842 | ₹23,620.8 |
| 6 | R.C.C. M30 grade in Foundation as per drawing and technical specification. | 329 | CUM | 9,880 | ₹32,50,520 |
| 7 | R.C.C. M30 grade in Superstructure as per drawing and technical specification. | 521 | CUM | 10,338 | ₹53,86,098 |
| 8 | Supplying, fitting and placing un-coated Mild steel reinforcement complete as per drawing and technical specification | 801 | Qtl | 7,548 | ₹60,45,948 |
| 9 | R.C.C. M35 grade in Superstructure as per drawing and technical specification. (Wearing coat) | 29 | CUM | 10,302 | ₹2,98,758 |
| 10 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification | 72 | CUM | 3,476 | ₹2,50,272 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.10 MB
BOQ_2100485.xls
BOQ • 0.30 MB
T2.pdf
Tender Documents • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .