Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAdmitted-Finance BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L1 | Admitted-Finance | |
| 2 | L2₹34.5 L+₹2.2 L (6.83%)Admitted-Finance BARDHAMAN BARDHAMAN 713378 WEST BENGAL | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L2 | Admitted-Finance | |
| 3 | L3₹40.2 L+₹7.9 L (24.5%)Admitted-Finance BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L3 | Admitted-Finance | |
| 4 | L4₹51.6 L+₹19.3 L (59.8%)Admitted-Finance KHOTTADIH PASCHIM BURDWAN 713378 | KHOTTADIH | PASCHIM BURDWAN | WEST BENGAL | 713378 | L4 | Admitted-Finance | |
| 5 | Rejected-Technical BABULA BARDHAMAN WEST BENGAL INDIA 713322 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713322 | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | MD. KALIM L3 | MD. HALIM L4 | ALKAMAR KHAN L2 | RAJIV KUMAR PANDEY L1 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of 14 numbers of Isolation stopping in K-12 Panel (Sub Panel K-12A and K-12B) in R-V Seam at Khottadih Colliery, Pandaveswar Area.(Inclusive of EPF/CMPF) | |||||||
| 1.01 | Cleaning for site preparation. | 33.48 | Cum | 500 ₹16,740 | 655 ₹21,929.4 | 422 ₹14,128.56 | 409 ₹13,693.32 Lowest |
| 1.02 | Recess cutting in floor and roof stone by hand. | 56.07 | Cum | 3,500 ₹1,96,245 | 4,575 ₹2,56,520.25 | 5,000 ₹2,80,350 | 2,863.83 ₹1,60,574.95 Lowest |
| 1.03 | Recess cutting in sides and roof in coal by hand. | 93.72 | Cum | 1,200 ₹1,12,464 | 1,621.5 ₹1,51,966.98 | 1,000 ₹93,720 Lowest | 1,015.2 ₹95,144.54 |
| 1.04 | P.B. Work (1:8) | 354.74 | Cum | 5,500 ₹19,51,070 | 6,852.5 ₹24,30,855.85 | 4,500 ₹15,96,330 | 4,289.72 ₹15,21,735.27 Lowest |
| 1.05 | Plastering both side (1:6). | 388.9 | Sq. Meter | 300 ₹1,16,670 | 378 ₹1,47,004.2 | 250 ₹97,225 | 236.77 ₹92,079.85 Lowest |
| 1.06 | Loading and unloading materials from surface to U.G.
from( 68L-73L/16D-17D) | 348 | Tub | 550 ₹1,91,400 | 723.5 ₹2,51,778 | 500 ₹1,74,000 | 453.02 ₹1,57,650.96 Lowest |
| 1.07 | Loading and unloading materials from surface to U.G.
from( 28D-24D/76L-77L) | 231 | Tub | 550 ₹1,27,050 | 723.5 ₹1,67,128.5 | 500 ₹1,15,500 | 453.02 ₹1,04,647.62 Lowest |
| 1.08 | Loading and unloading materials from surface to U.G.
from( 4D-8D/68L-69L) | 134 | Tub | 550 ₹73,700 | 723.5 ₹96,949 | 500 ₹67,000 | 453.02 ₹60,704.68 Lowest |
| 1.09 | Mechanically transportation of tub (above 1500m). | 713 | Tub | 700 ₹4,99,100 | 914 ₹6,51,682 | 900 ₹6,41,700 | 572.15 ₹4,07,942.95 Lowest |
Tender Value
₹60.9 L
EMD Value
₹76,200
Closing Date
6 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Survey Officer
Office of the General Manager PandaveswarArea , P.O. Pandaveswar, Dist.-PaschimBardhaman, West Bengal-713346
Construction of 14 numbers of Isolation stopping in K-12 Panel (Sub Panel K-12A and K-12B) in R-V Seam at Khottadih Colliery, Pandaveswar Area.
2026_ECL_367869_1
GM/PND/Sur/Ten/26-27/70/211 Dated 30.10.2026
Open Tender
Civil Works - Others
Item Rate
30 days
Khottadih Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹76,200
18 Nov 2026
30 Oct 2026
7 Nov 2026
30 Oct 2026
6 Nov 2026
30 Oct 2026
30 Oct 2026 - 3 Nov 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of 14 numbers of Isolation stopping in K-12 Panel (Sub Panel K-12A and K-12B) in R-V Seam at Khottadih Colliery, Pandaveswar Area.(Inclusive of EPF/CMPF) | |||||
| 1.01 | Cleaning for site preparation. | 33.48 | Cum | - | - |
| 1.02 | Recess cutting in floor and roof stone by hand. | 56.07 | Cum | - | - |
| 1.03 | Recess cutting in sides and roof in coal by hand. | 93.72 | Cum | - | - |
| 1.04 | P.B. Work (1:8) | 354.74 | Cum | - | - |
| 1.05 | Plastering both side (1:6). | 388.9 | Sq. Meter | - | - |
| 1.06 | Loading and unloading materials from surface to U.G.
from( 68L-73L/16D-17D) | 348 | Tub | - | - |
| 1.07 | Loading and unloading materials from surface to U.G.
from( 28D-24D/76L-77L) | 231 | Tub | - | - |
| 1.08 | Loading and unloading materials from surface to U.G.
from( 4D-8D/68L-69L) | 134 | Tub | - | - |
| 1.09 | Mechanically transportation of tub (above 1500m). | 713 | Tub | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.67 MB
BOQ_380841.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .