Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Cdr not uploaded rejected |
Tender Value
Refer Docs
Closing Date
8 Feb 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Upgradation of road by way of drainage and pipe culvert from darul uloom to bhuwan road Chanjmulla
2022_RDPR_159136_13
NIT No143 2021-22 2nd Fresh
Open Tender
Civil Works
Item Rate
30 days
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Yes
EXECUTIVE ENGINEER REW KUPWARA
Yes
8 Feb 2022
3 Feb 2022
8 Feb 2022
3 Feb 2022
8 Feb 2022
3 Feb 2022
3 Feb 2022 - 3 Feb 2022
30 days
Amount
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar
Earth work in excavation by mannual mean in trenchs for foundation , drains, pipes , cables etc ( not exceeeding 1.5 mtr in width and for shafts wells , cesspits and the like not exceeding 10sqm on plan , depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed in . All kind of soil.
Providing and laying of stone soling (hand packed tightly ) incliuding all carriages of Material upto site of work complete Job by MT aas well as HL
P/L in position specified grade e including curing but excluding the cost of centering and shuttering, finishig and reinforcement All work upto plinth level with 1:4:8(1cement:4coarse sand : 8graded stone agg. 40 mm size ) including all carriages by MT as well as HL of material up to site of Work Complete job.
Centering and shuttering incl. strutting propping etc and removal off form work for:- Foundation footings ,bases of columns, spended floors, roofs, landing etc with all carriages of material by MT as well as HL up to site of work Complete job
P/L in position cement concrete. of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with 1:3:6(1cement:3 coarse sand : 6 graded stone agg 20 mm size including all carriages by MT as well as HL of material up to site of work complete job.
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 11.3.3 50 mm thick with 20mm nominal size stone aggregate.
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand)
Providing and filling of nallah muck including ramming/compacting with all types of carriages
Providing and laying of R.C.C Spun pipes of 12 inch dia ( 02 no.) and 18 inch dia (02 no.) , complete job
Providing and fixing of Community Inforamtion board (CIB)
ISHFAQ RASOOL KHAN
MEHRAJ U DIN WANI
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .