Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical AT LALA LAJPAT NAGAR ROAD NO 06 NEAR LALA LAJPAT RAI SCHOOL CHAPU TOLI PUNDAG RANCHI JHARKHAND 834004 | RANCHI | JHARKHAND | 834004 | Accepted-Technical Accept |
| 2 | Accepted-Technical BELAVATIKAR TOLA RARO P S DANDAI GARHWA | Accepted-Technical Accept |
| 3 | Rejected-Technical BALUMATH LATEHAR | LATEHAR | JHARKHAND | 822111 | Rejected-Technical show as a live establishment in EPFO records but the bidder has failed to provide the required updated employee pf contribution challan |
| 4 | Rejected-Technical AMIKA MANSILLPARK SASCET DARDEADO JOINED COLLEGE DOORDA RANCHI HOB | Rejected-Technical letter no 0 Dated 12.08.2026 due to parsanal reason is out of tender |
| 5 | Rejected-Technical | Rejected-Technical letter no 0 Dated 12.08.2026 due to parsanal reason is out of tender |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
10 Aug 2026, 2:00 pmClosed
Executive Engineer N.R.E.P-1,Ranchi
Executive Engineer N.R.E.P-1,Ranchi
Renovation Work of SC Boys Hostel Kanke Ranchi
2026_NREPR_116771_1
NREP1/29/2026-27 ITDA
Open Tender
Civil Works
Item Rate
180 days
Ranchi
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹3.0 L
24 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
10 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 0.2 | cum | - | - |
| 2 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 0.8 | cum | - | - |
| 3 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | - | CUM | - | - |
| 4 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume). | 1 | CUM | - | - |
| 5 | Providing designation 75A brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening maerials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | - | cu.m | - | - |
| 6 | Providing designation 75B brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening maerials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | - | CUM | - | - |
| 7 | Providing designation 75 A brick work in C.M. (1: 6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. | - | cu.m | - | - |
| 8 | Providing designation 75 B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. | - | CUM | - | - |
| 9 | Providing designation 125 mm thick reinforced designation 75A brick work in CM (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 25 including the cost of screening, carriage of materials, scaffolding , raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement) all complete as per building specification and direction of E/I. | 1 | SQM | - | - |
| 10 | Providing designation 100A brick work with fly ash lime brick (FLAG) confirming to IS 12894-1990 (9" x 4.5" x 3") in C.M. (1:6) in superstructure with approved quality of clean sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 0.4 | m3 | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
boyhostel.pdf
Tender Documents • 1.66 MB
BOQ_157877.xls
BOQ • 1.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .