Loading…
Loading…
Tender Value
₹31.3 L
EMD Value
₹73,860
Closing Date
10 Jul 2026, 5:00 pmDue tomorrow
Senior Manager(Civil)
TDS City, Ghaziabad
Upgradation of Approach Road in Village Khanpur Japti I.A. TDS City Ghaziabad
2026_SIDC_1162177_1
CD-III(78) dt. 05.06.2026
Open Tender
Civil Works
120 days
I.A. TDS City
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,206
Executive Engineer
₹73,860
20 Jun 2026
20 Jun 2026
13 Jul 2026
20 Jun 2026
10 Jul 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas. | 262 | Cum. | 110 | ₹28,820 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 65.5 | Cum. | 169.91 | ₹11,129.11 |
| 3 | Cartage of earth ….. Upto 2 km | 183.5 | Cum. | 124.8 | ₹22,900.8 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:- 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 41.92 | Cum. | 4,300 | ₹1,80,256 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in: Cement mortar 1:6 (1 cement : 4 coarse sand) | 270.8 | Cum. | 5,010 | ₹13,56,708 |
| 6 | Cement Concrete with 2cm gauge Stone approved stone ballast, coarse sand & cement in Proportion of 1:2:4 including supply of all material , labour, tools & plants etc. require for proper completion of work. | 12.51 | Cum. | 7,050 | ₹88,195.5 |
| 7 | 12 mm cement plaster of mix : (1 cement: 4 Coarse sand) | 1,123.52 | Sqm. | - | - |
| 8 | Steel work welded in built up sections/ framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as requiredIn gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,440 | kg | - | - |
| 9 | Supply & Laying Spreading And Compacting 22.5 mm to 53 mm size Stone Aggregate of Specified Sizes to WBM specification of uniform thickness,hand /picking ,rolling with 3 wheeled Road vibratory roller 8-10 tonne capacity in stages to proper grade and camber ,applying and brooming requisite type of screening /binding material to fill the interstices of coarse aggregate ,watering and compacting to fill the required Density. | 46.91 | Cum. | 2,022.9 | ₹94,894.24 |
| 10 | Supply & Stacking of Screening material approved quality of consolidation of stone ballast including of material labour T& P etc. required for proper completion of work . | 9.38 | Cum. | 1,977.75 | ₹18,551.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.46 MB
NITKHANPUR.pdf
Tender Documents • 1.13 MB
FEE.xls
Additional Documents • 0.02 MB
BOQ_2178412.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid