Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | ₹4.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.7 L+₹30,000.25 (6.77%)Accepted-AOC | ₹4.7 L+₹30,000.25 (6.77%) | L2 | Accepted-AOC Accepted |
| 3 | L3₹5.0 L+₹56,938.12 (12.9%)Rejected-Finance MODEL TOWN 104 RL MODEL TOWN REWARI 123401 | REWARI | REWARI | HARYANA | 123401 | ₹5.0 L+₹56,938.12 (12.9%) | L3 | Rejected-Finance Rejected |
Tender Value
₹4.4 L
EMD Value
₹8,827
Closing Date
4 Mar 2020, 3:00 pmClosed
EE PD PWD B and R Rewari
EE PD PWD B and R Rewari
Providing and Fixing barrier for 2 lane ROB in lieu of level crossing no.19-C on Subana Kosli nahar kanina road near Kosli Railways Station on Bhatuinda Railway line km 28.5 in Rewari Distt.(Re-Invited)
2020_HRY_119294_1
Providing and Fixing 2 lane ROB SKNK road
Open Tender
Civil Works - Roads
Works
30 days
Rewari
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
EE PD PWD B and R Rewari
₹8,827
Yes
5 Mar 2020
19 Feb 2020
4 Mar 2020
19 Feb 2020
4 Mar 2020
19 Feb 2020
Amount
Earth work in excavation in foundations, trenches etc. in all kinds of soil, not exceeding 2 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry in 15 cm layers with compaction, including disposal of all surplus soil as directed within a lead of 30 Mtrs. (HSR 6.6)
Cement Concrete 1:4:8 with stone aggregate 20mm nominal size in first storey upto 4 meters above plinth level. [HSR 10.56]
Cement Concrete 1: 1 ½: 3 with stone aggregate 20mm nominal size in foundation and plinth. [HSR 10.42]
Structural steel work in compound girders or stanchions built up from two or more R.S. joists or channel section or plates, angle etc. welded including cutting and fixing all lattice bars, stiffeners, gusset plates, bolts, nuts, welding rods, etc. complete with flange plates, heads, sole plates, angle connections, etc., with hoisting and erecting in positing: (b) with two or more channels, or plates or angle irons, etc. [HSR 18.9 (b)]
Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or matallic or plastered or concrete surfaces to give an even shade.. [HSR 16.3+16.9]
S.S. Infrastructure
P P ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .