| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.1 LAccepted-AOC | ₹60.1 L | L1 | Accepted-AOC As directed by CWC, Contract Agreement is placed on the L1 Contractor, M/s. Santhosh Infrastructure, Chennai at their quoted amount of Rs.60,06,960.60/- for the subject work. |
| 2 | L2₹63.1 L+₹3.0 L (5.01%)Rejected-Finance | ₹63.1 L+₹3.0 L (5.01%) | L2 | Rejected-Finance Being L2 Contractor. Not Accepted. |
| 3 | L3₹68.7 L+₹8.6 L (14.3%)Rejected-Finance | ₹68.7 L+₹8.6 L (14.3%) | L3 | Rejected-Finance Being L3 Contractor. Not Accepted. |
| Sl No | Description | Qty | Unit | Sri Lakshmi Industries L3 | Santhosh Infrastructure L1 | BRIDGE AND ROADS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Demolition of reinforced Concrete structure of any description | 2.1 | CUM | 2,275 ₹4,777.5 | 2,166 ₹4,548.6 | 2,000 ₹4,200 Lowest |
| 2.00 | M & L for R.C.C A1 Type, 1: 1.5: 3 M20, 20mm graded aggregate in columns, pillars, piers, posts and struts etc (concrete work should be use of Ready Mix Concrete (RMC) of M/S.ULTRA-TEC / M/S. BIRLA / M/S.RAMCO / M/S.ACC / M/S.COROMANDAL. / M/S.RMC. or Suitably Equivalent Make
(minimum cement content shall be 350kg per cum) | 18 | CUM | 10,024 ₹1,80,432 | 9,000 ₹1,62,000 Lowest | 9,000 ₹1,62,000 Lowest |
| 3.00 | M & L for R.C.C A1 Type, 1: 1.5: 3 M20, 20mm graded aggregate in beams, cantilevers, bressummers, lintels over 1.50m span etc., (concrete work should be use of Ready Mix Concrete (RMC) of M/S.ULTRA-TEC / M/S. BIRLA / M/S.RAMCO / M/S.ACC / M/S.COROMANDAL. / M/S.RMC or Suitably Equivalent Make
(minimum cement content shall be 350kg per cum). | 9 | CUM | 9,531 ₹85,779 | 9,000 ₹81,000 | 8,700 ₹78,300 Lowest |
| 4.00 | M & L for R.C.C A1 Type, 1: 1.5: 3 M20, 20mm graded aggregate in Slabs supported on walls,beams and columns in floors,roofs, landings, balconies,canopies, deck slabs and in shelves and the like.etc.(concrete work should be use of Ready Mix Concrete (RMC) of M/S.ULTRA-TEC / M/S. BIRLA / M/S.RAMCO / M/S.ACC / M/S.COROMANDAL. / M/S.RMC. or Suitably Equivalent Make (minimum cement content shall be 350kg per cum) | 25 | CUM | 8,619 ₹2,15,475 | 8,000 ₹2,00,000 Lowest | 8,000 ₹2,00,000 Lowest |
| 5.00 | Supply and fixing of mild steel reinforcement deformed or twisted bars including bending, cranking, hooking and tieing with mild steel wire not less than 0.90mm dia. Used RINL-VIZAG Steel/SAIL/TATA-TISCON/"BIS"MARKED or Suitably Equivalent Make | 5,200 | KG | 99 ₹5,14,800 | 95 ₹4,94,000 Lowest | 95 ₹4,94,000 Lowest |
| 6.00 | M & L for form work to side of RCC Member such as columns, pillars etc., and the finishing shall be of fair finished surface. | 90 | SQM | 819 ₹73,710 | 600 ₹54,000 Lowest | 750 ₹67,500 |
| 7.00 | M & L for form work to sides and soffits of floor or roof beam, beam, lintels, cantilevers, shelves, columns, slabs including supports, overhangs etc., and the finishing shall be of fair finished surface. | 150 | SQM | 656 ₹98,400 | 580 ₹87,000 Lowest | 650 ₹97,500 |
| 8.00 | M & L for form work to soffits rough, flat finish surfaces of suspended slabs such as roof slabs, floor slabs, landings and similar work not exceeding 200mm thick (Horizontal or sloping) and the finishing shall be of fair finished surface. | 180 | SQM | 695 ₹1,25,100 | 550 ₹99,000 Lowest | 650 ₹1,17,000 |
| 9.00 | M & L for Brick work built in CM.1:6 using Good quality modular bricks / solid Concrete bricks straight or curved on plan exc 6m mean radius. | 75 | CUM | 7,850 ₹5,88,750 | 5,200 ₹3,90,000 Lowest | 7,000 ₹5,25,000 |
| 10.00 | M & L for half Brick wall built in CM.1:4 using Sub-Class “B” Bricks. | 30 | SQM | 812 ₹24,360 | 600 ₹18,000 Lowest | 750 ₹22,500 |
Tender Value
₹65.1 L
EMD Value
₹1.2 L
Closing Date
18 Jun 2026, 2:00 pmClosed
THE CHIEF GENERAL MANAGER
THE CGM, FMU-HVF, AVADI, CHENNAI - 54
CONSTRUCTION OF TWO NEW VIP SUITES ABOVE NS1 AND NS2 IN AVNL GUEST HOUSE AT AVNL ESTATE
2026_AVNL_279485_1
HVF/TE/13025/CEO/2026-27/19
Open Tender
Civil Works
Works
240 days
AVNL ESTATE
Details enclosed
8 documents required · 8 mandatory
₹0
₹1.2 L
4 Aug 2026
3 Jun 2026
19 Jun 2026
3 Jun 2026
18 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of reinforced Concrete structure of any description | 2.1 | CUM | 2,166.26 | ₹4,549.15 |
| 2 | M & L for R.C.C A1 Type, 1: 1.5: 3 M20, 20mm graded aggregate in columns, pillars, piers, posts and struts etc (concrete work should be use of Ready Mix Concrete (RMC) of M/S.ULTRA-TEC / M/S. BIRLA / M/S.RAMCO / M/S.ACC / M/S.COROMANDAL. / M/S.RMC. or Suitably Equivalent Make
(minimum cement content shall be 350kg per cum) | 18 | CUM | 9,546.27 | ₹1,71,832.86 |
| 3 | M & L for R.C.C A1 Type, 1: 1.5: 3 M20, 20mm graded aggregate in beams, cantilevers, bressummers, lintels over 1.50m span etc., (concrete work should be use of Ready Mix Concrete (RMC) of M/S.ULTRA-TEC / M/S. BIRLA / M/S.RAMCO / M/S.ACC / M/S.COROMANDAL. / M/S.RMC or Suitably Equivalent Make
(minimum cement content shall be 350kg per cum). | 9 | CUM | 9,077.53 | ₹81,697.77 |
| 4 | M & L for R.C.C A1 Type, 1: 1.5: 3 M20, 20mm graded aggregate in Slabs supported on walls,beams and columns in floors,roofs, landings, balconies,canopies, deck slabs and in shelves and the like.etc.(concrete work should be use of Ready Mix Concrete (RMC) of M/S.ULTRA-TEC / M/S. BIRLA / M/S.RAMCO / M/S.ACC / M/S.COROMANDAL. / M/S.RMC. or Suitably Equivalent Make (minimum cement content shall be 350kg per cum) | 25 | CUM | 8,208.36 | ₹2,05,209 |
| 5 | Supply and fixing of mild steel reinforcement deformed or twisted bars including bending, cranking, hooking and tieing with mild steel wire not less than 0.90mm dia. Used RINL-VIZAG Steel/SAIL/TATA-TISCON/"BIS"MARKED or Suitably Equivalent Make | 5,200 | KG | 94.15 | ₹4,89,580 |
| 6 | M & L for form work to side of RCC Member such as columns, pillars etc., and the finishing shall be of fair finished surface. | 90 | SQM | 780.24 | ₹70,221.6 |
| 7 | M & L for form work to sides and soffits of floor or roof beam, beam, lintels, cantilevers, shelves, columns, slabs including supports, overhangs etc., and the finishing shall be of fair finished surface. | 150 | SQM | 624.67 | ₹93,700.5 |
| 8 | M & L for form work to soffits rough, flat finish surfaces of suspended slabs such as roof slabs, floor slabs, landings and similar work not exceeding 200mm thick (Horizontal or sloping) and the finishing shall be of fair finished surface. | 180 | SQM | 662 | ₹1,19,160 |
| 9 | M & L for Brick work built in CM.1:6 using Good quality modular bricks / solid Concrete bricks straight or curved on plan exc 6m mean radius. | 75 | CUM | 7,200 | ₹5,40,000 |
| 10 | M & L for half Brick wall built in CM.1:4 using Sub-Class “B” Bricks. | 30 | SQM | 773.48 | ₹23,204.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_326239.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .