| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-Finance | ₹2.4 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹2.5 LAccepted-Finance | ₹2.5 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | SUBBAN ENTERPRISES | RJ ENGINEERING WORKS |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift. curing, etc. complete. | 3 | M3 | 15,660 ₹18,478.80 | 15,426 ₹18,202.68 |
| 2.00 | Chipping the existing concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete. | 127.4 | M2 | 6,242.6 ₹7,366.27 | 6,051.5 ₹7,140.77 |
| 3.00 | Supplying and fabricating and forming in position of the new angle, channel & beam as directed carefully without any disturbance to other steel structure rate including cost of all materials, hire charges for welding and cutting machine, welding rods including labour, lead, lift, safety appliances etc., complete. | 339.9 | Kg | 35,689.5 ₹42,113.61 | 33,310.2 ₹39,306.04 |
| 4.00 | Supplying and fixing Cuddapah slab for fixing over the water tank roof slab including cost of all materials, labour, lead, lift etc., complete. | 20.1 | M2 | 21,105 ₹24,903.90 | 20,100 ₹23,718 |
| 5.00 | Plastering with Fosroc Brushbond grey for Overhead tank interier surface including cost of all materials, labour, lead, lift, curing etc. complete. | 58.1 | M2 | 45,318 ₹53,475.24 | 43,269.98 ₹51,058.58 |
| 6.00 | Plastering with CM 1:3, 20mm thick for concrete surface including cost of all materials, labour, lead, lift, curing etc. complete. | 69.3 | M2 | 48,510 ₹57,241.80 | 45,599.4 ₹53,807.29 |
| 7.00 | Applying one coat of white wash with white cement to the newly plastered surface, including cost of all materials, labours, lead, lift, scaffolding, curing, etc., complete. | 69.3 | M2 | 5,197.5 ₹6,133.05 | 4,435.2 ₹5,233.54 |
| 8.00 | Supplying laying and jointing in position of 15mm, 20mm, 25mm and 32mm dia GI pipes ('B' Class) as instructed by the site Engineer rate, including cost of all materials, labour, lead, lift, with necessary scaffolding etc., complete. (a) 15mm dia GI Pipe | 36 | Rm | 13,140 ₹15,505.20 | 12,240 ₹14,443.20 |
| 8.20 | (b) 20mm dia GI Pipe | 36 | Rm | 14,220 ₹16,779.60 | 13,464 ₹15,887.52 |
| 8.30 | (c) 25mm dia GI Pipe | 36 | Rm | 16,200 ₹19,116 | 15,336 ₹18,096.48 |
Tender Value
Refer Docs
EMD Value
₹2,500
Closing Date
26 Feb 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Arresting the Leakage to Water Tank of Type 2 Quarters 2, 3 and 4 Blocks at Analmin Nagar
2026_EB_661709_1
CE SE C TTPS Spec.No. 420 25 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,500
Yes
2 Mar 2026
19 Feb 2026
27 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift. curing, etc. complete.
Chipping the existing concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete.
Supplying and fabricating and forming in position of the new angle, channel & beam as directed carefully without any disturbance to other steel structure rate including cost of all materials, hire charges for welding and cutting machine, welding rods including labour, lead, lift, safety appliances etc., complete.
Supplying and fixing Cuddapah slab for fixing over the water tank roof slab including cost of all materials, labour, lead, lift etc., complete.
Plastering with Fosroc Brushbond grey for Overhead tank interier surface including cost of all materials, labour, lead, lift, curing etc. complete.
Plastering with CM 1:3, 20mm thick for concrete surface including cost of all materials, labour, lead, lift, curing etc. complete.
Applying one coat of white wash with white cement to the newly plastered surface, including cost of all materials, labours, lead, lift, scaffolding, curing, etc., complete.
Supplying laying and jointing in position of 15mm, 20mm, 25mm and 32mm dia GI pipes ('B' Class) as instructed by the site Engineer rate, including cost of all materials, labour, lead, lift, with necessary scaffolding etc., complete. (a) 15mm dia GI Pipe
(b) 20mm dia GI Pipe
(c) 25mm dia GI Pipe
(d) 32mm dia GI Pipe
Supplying and fixing GM Wheel valve of approved quality including cost of all materials, labour, lead, lift etc., complete (a) 32mm Wheel valve
(b) 25mm Wheel valve
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_794261.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid