Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.5 LAccepted-Finance 3 605 G F 105 SECTOR 3 VASUNDHARA GHAZIABAD UTTAR PRADESH 201012 | GHAZIABAD | UTTAR PRADESH | 201012 | L1 | Accepted-Finance L1 | |
| 2 | L2₹63.6 L+₹19.1 L (42.8%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical due to proper document not uploaded |
Tender Value
Refer Docs
EMD Value
₹44,500
Closing Date
23 Nov 2023, 12:00 pmClosed
SE EUDC-III GHAZIABAD
SE EUDC-III GANDHI NAGAR GZB
Work of fortification of line Under Business Plan Scheme 2023-24 on semi turnkey basis in the Area of EE, EUDD-VII Ghaziabad. Under the jurisdiction of SE, EUDC-III, Ghaziabad.
2023_PVVNL_862774_1
51/W/2023-24/EUDD-VII/EUDC-III GZB
Open Tender
Electrical Works
Item Rate
90 days
SE EUDC-III GANDHI NAGAR GZB
Please Refer Tender Documents
2 documents required · 2 mandatory
₹3,540
SE EUDC-III GZB
₹44,500
25 Nov 2023
17 Nov 2023
23 Nov 2023
17 Nov 2023
23 Nov 2023
17 Nov 2023
Amount
Carriage of LT ABC Cable (3x120+1x95+1x16) sqmm from Store center to work site loading and unloading both side. distance 0 km to 50 km.
Carriage of LT ABC Cable (3x95+1x50+1x16) sqmm from Store center to work site loading and unloading both side. distance 0 km to 50 km.
Carriage of PCC Pole 8.5 Mtr from Store center to work site loading and unloading both side. distance 0 km to 50 km.
Carriage of ST Pole 11 Mtr long from Store center to work site loading and unloading both side. distance 0 km to 50 km.
Carriage of 11 KV Polymeric Disc Insulator with Fitting-117, 11 KV Polymeric Pin Insulator-517, 11 KV Polymeric Pin Insulator with Pin-27 from Store center to work site loading and unloading both side. distance 0 km to 50 km.
Carriage of ACSR Dog conductor from Store center to work site loading and unloading both side. distance 0 km to 50 km.
Carriage of ACSR Rabit conductor from Store center to work site loading and unloading both side. distance 0 km to 50 km.
Dismentling of (old & used) ACSR Dog conductor from various site and safley carriage to Store center/JE store loading and unloading both side.
Dismentling of (old & used) ACSR Dog conductor from various site and safley carriage to Store center/JE store loading and unloading both side.
Dismentling of ST Pole off size (old & used) from various site and safley carriage to Store center/JE store loading and unloading both side.
Carriage of ACSR Weasel Conductor/AB Cable (old & damage) from various site and carriage to Store center/JE store loading and unloading both side.
Erection of 8.5 mtr long PCC Pole complete in all respect as per RESPO norms.
Erection of 11 mtr long ST Pole complete in all respect as per RESPO norms.
Providing and Concreting of Support/Pole complete in all respect as per respo norms.
Providing and Earthing Complete in all respect as per respo norms.
Laying, Lifting and sagging of LT ABC (3x120+1x95+1x16) sqmm complete in all respect as per respo norms.
Laying, Lifting and sagging of LT ABC (3x95+1x50+1x16) sqmm complete in all respect as per respo norms.
Laying, Lifting and sagging of ACSR Dog conductor complete in all respect as per respo norms.
Laying, Lifting and sagging of ACSR Rabit conductor complete in all respect as per respo norms.
Fixing of 11 KV Polymeric Disc Insulator with fitting complete in all respect as per respo norms.
Fixing of 11 KV Polymeric Pin Insulator complete in all respect as per respo norms.
Fixing of 11 KV Polymeric Pin Insulator with Pin complete in all respect as per respo norms.
Supply & fixing of Suspension clamp at various site complete in all respect as per respo norms.
Supply & fixing of MS Nut & Bolt at various site complete in all respect as per respo norms.
Supply & fixing of Piercing Connecting Cable at various site complete in all respect as per respo norms.
Supply & fixing of Dead & Clamp at various site complete in all respect as per respo norms.
Supply & fixing of Piercing Clamp at various site complete in all respect as per respo norms.
Supply & fixing of J/I Hook Clamp with N&B at various site complete in all respect as per respo norms.
Supply & fixing of 3 Phase Distribution Box at various site complete in all respect as per respo norms.
Supply & fixing of MS holding Clamp at various site complete in all respect as per respo norms.
Supply & fixing of 11 kv V Type cross Arm at various site complete in all respect as per respo norms.
Supply & fixing of MS Nut & Bolt with clamp at various site complete in all respect as per respo norms.
Supply & fixing of F Clamp at various site complete in all respect as per respo norms.
Supply & fixing of F-Bracket with Nut & bolt at various site complete in all respect as per respo norms.
Supply & fixing of Stone pad at various site complete in all respect as per respo norms.
Supply & fixing of (Stay set Complete) Extra for stay at angle location (stay rod 16x1800mm, stay wire 5 kg, stay clamp, bolt & nut with grouting) at various site complete in all respect as per respo norms.
Supply & fixing of 33 kv X Arm clamp at various site complete in all respect as per respo norms.
Supply & fixing of X Arm holding clamp at various site complete in all respect as per respo norms.
Supply & fixing of MS Angle 65x65x6 at various site complete in all respect as per respo norms.
Supply & gaurding fixing of GI wire 10 SWG at various site complete in all respect as per respo norms.
Supply & gaurding fixing of GI wire 8 SWG at various site complete in all respect as per respo norms.
Making of all HT/LT connections required to energize the line and restoring of electricity supply to consumer properly complete in all respect.
Yash Contractor
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .