| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹95.1 LAccepted-AOC | ₹95.1 L Quoted ₹1.4 Cr | 1 | Accepted-AOC ACCEPT |
| 2 | 2₹1.4 Cr+₹3.5 L (2.59%)Rejected-AOC | ₹1.4 Cr+₹3.5 L (2.59%) | 2 | Rejected-AOC REJECT |
| 3 | 3₹1.5 Cr+₹12.3 L (9.01%)Rejected-AOC | ₹1.5 Cr+₹12.3 L (9.01%) | 3 | Rejected-AOC REJECT |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
24 Feb 2020, 1:00 pmClosed
Superintending Engineer
I.W.C. Mathura
CONSTRUCTION OF RETAINING WALL
2020_UPIDC_430505_2
05/SE/2019-20 LOT NO. 02
Open Tender
Civil Works - Canal
Item Wise
45 days
I.W.C. Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
E.E.U.M.B.D.G.C.KHURJA
₹3.3 L
23 Mar 2021
18 Feb 2020
24 Feb 2020
18 Feb 2020
24 Feb 2020
18 Feb 2020
Amount
Earth work in excavation in ordinary soil including all lift & lead and back filling ,watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour,all T&P,leads & lift etc.
Laying C. C. 1:4:8 Cement Concrete including all cost of matrial labour T&P. etc. Complete.
M-150 brick work in 1:4 cm. ncluding all cost of material T&P. all lead and lift etc complete
Cement plaster in 1:4 including cost of all material all leade and lift etc for proper complection of work .T&P.
Laying C. C. M-15 ( 1:2:4) Cement concrete including all cost of material labour T & P all lift and leads etc.complete
Laying C. C. M-20 ( 1:1.5:3) Cement concrete including all cost of material labour T & P all lift and leads etc.complete
Laying R. C. C. M-20 ( 1:1.5:3) Cement concrete including all cost of material labour T & P all lift and leads etc.complete
Providing and fixing steel Reinforcement including cost of steel , binding wire, cutting, bending, binding, welding & placing in proper position all lift and leads all labour T&P. etc complete.
Supplying & fixing drainage pipe 75mm dia including all cost of material labour T&P.
Supply and fixing of 20mm expension joint in slab including cost all labour T&P. material etc complete as per direction of Engineer-in-charge.
Providing & fixing Centering and shuttering for C. C. work @ R.C.C. including all cost of material labour T & P all lift and leads etc.complete (RCC+CC)
Laying stone boulders pitching in launching apron including cost of all material,labour,T&P. all lift & leads etc. complete. As per direction of Engineer-in-charge.
Providing & fixing Iron Gate i/c material labour T&P--
M/s VIJAY ASSOCIATE
M/S J.V. CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .