| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAccepted-Finance | ₹22.7 L | L1 | Accepted-Finance Accept |
| 2 | L2₹23.0 LRejected-Finance | ₹23.0 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | P R Ramaraj L2 | D SEKAR L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2M in light black cotton soil, hard stiff clay, stiff black cotton, hard red earth, shales, Muram, gravel stoney earth and etc., as per SS 20B.(TNBP SS No. 23 & 24) | 56.7 | Cum | 209 ₹11,850.30 | 197.8 ₹11,215.26 |
| 1.02 | Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed. | 18.9 | Cum | 5,457 ₹1.0 L | 5,446 ₹1.0 L |
| 1.03 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with all cross bracings using mild steel sheets of size 90 cm. x 60 cm. and 10 gauge stiffened, welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joist of size 10 cm x 6.5 cm dia spaced at about 90 cm. centre to centre and supported by casuarina props of 10 cm to 13 cm. dia spaced at 75 cm. centre to centre etc. complete complying with standard specification and as directed for the following items. | 486 | Sqm | 401 ₹1.9 L | 390 ₹1.9 L |
| 1.04 | Cement Concrete 1:3:6 (One cement Three sand and Six hard brocken stone) using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed. | 55.89 | Cum | 6,210 ₹3.5 L | 6,199 ₹3.5 L |
| 1.05 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 135 | Cum | 2,577 ₹3.5 L | 2,566.25 ₹3.5 L |
| 1.06 | Supplying and laying inder blocking Power Block of 60mm thick required shap in cement morter 1:1:2 using 10 -12 mm size HBG stone jelly inculding cost of centering shuttering laying vibrating ( with mechnical vibrating) finishing curing land the cost inculding transporting etc., completed as per standard specifications., | 1,350 | Sqm | 698 ₹9.4 L | 687.45 ₹9.3 L |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,50,486.19 ₹3.5 L | 3,46,436.64 ₹3.5 L |
Updated dates
Tender Value
₹2.3 Cr
EMD Value
₹23,000
Closing Date
24 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (V.P)
BLOCK DEVELOPMENT OFFICER (V.P) PERIYAKULAM PANCHAYAT UNION
PROVIDING PAVER BLOCK AT KARADI POTTAL IN KEELAVADAKARAI PANCHAYAT
2026_RDTN_660370_1
4912/2025/A4
Open Tender
Civil Works
PERIYAKULAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹23,000
Yes
24 Feb 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2M in light black cotton soil, hard stiff clay, stiff black cotton, hard red earth, shales, Muram, gravel stoney earth and etc., as per SS 20B.(TNBP SS No. 23 & 24)
Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with all cross bracings using mild steel sheets of size 90 cm. x 60 cm. and 10 gauge stiffened, welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joist of size 10 cm x 6.5 cm dia spaced at about 90 cm. centre to centre and supported by casuarina props of 10 cm to 13 cm. dia spaced at 75 cm. centre to centre etc. complete complying with standard specification and as directed for the following items.
Cement Concrete 1:3:6 (One cement Three sand and Six hard brocken stone) using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Supplying and laying inder blocking Power Block of 60mm thick required shap in cement morter 1:1:2 using 10 -12 mm size HBG stone jelly inculding cost of centering shuttering laying vibrating ( with mechnical vibrating) finishing curing land the cost inculding transporting etc., completed as per standard specifications.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tendernotice_2.pdf
PDF • 0.35 MB
BOQ_792318.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid