Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC PANCHKULA | ₹3.8 Cr | L1 | Accepted-AOC Award |
| 2 | L2₹4.3 Cr+₹51.3 L (13.6%)Rejected-Finance HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹4.3 Cr+₹51.3 L (13.6%) | L2 | Rejected-Finance Rejected |
Tender Value
₹3.8 Cr
EMD Value
₹7.5 L
Closing Date
30 Dec 2019, 5:00 pmClosed
EXECUTIVE ENGINEER PHED NO. 2, PANIPAT
EXECUTIVE ENGINEER PHED NO. 2, PANIPAT
3 MLD STP at village Sewah Distt. Panipat
2019_HRY_112648_1
EIC PHED Panchkula memo No. 95000 dated 11.09.19
Open Tender
Civil Works
Works
548 days
PANIPAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
Engineer in Chief
₹7.5 L
6 Feb 2020
14 Dec 2019
31 Dec 2019
14 Dec 2019
30 Dec 2019
14 Dec 2019
Amount
Design, construction, erection, testing & commissioning of MPS and following components including O & M for 12 months during defect liability period after trail run 3 month and 10 year thereafter (i) RCC inlet chamber, screen chamber, rectangular collecting tank suitable for 3.00 MLD average flow with peak factor 3, Providing and installing 1 No. of 5300 LPM 15 mtr. Head, 2 no. 1800LPM 15 m head, 2 no. 900 LPM 15 m head non clog sewage pumping sets each with suitable LT panel equipped with all safety devices, automatic capacitor bank and submersible cable from LT Panel to pump sets complete in all respects. (ii) K-9 D.I pipe of suitable dia at MPS including welding and screwing of flanges. ISI Marked D.I fittings, Sluice valves, Non return valves as per requirement even for bye pass arrangement complete in all respects. (iii) 3 Nos. CI Gear operated sluice gate with SS spindle ( SS 410) and seats ( SS 304 ) (2 Nos for screens and no.1 for partition of collecting tank) as per design. (iv) Supply and installation of 2 nos. mechanical coarse screens of minimum length 6 mtr. For 3.00 MLD average flow with peak factor of 3.0. Note: 1. The connecting sewer of same diameter and material of construction, Laid at adequate depth between existing sewers to newly constructed structures is included in scope of work. 2. All the pumping machinery, Panel Board, Level sensor etc shall be controlled by PLC & SCADA and shall be synchronized with the PLC panels at MPS & STP site through broadband internet facility. 3. The size and quantities of all the above components will be as per approved structural/ Hydraulic/ Mechanical / Electrical Design to be approved by department before actual execution of work including O & M for 12 months during defect liability period after trail run 3 month and 10 year thereafter
STP- Design, construction, erection, testing & commissioning of 3.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping & all other contingent Electrical, Mechanical, Piping & Instrumentation work. With PLC & SCADA Arrangement for STP integrated with MPS as per detail given in the bid document and following components including O & M for 12 months during defect liability period after trail run 3 month and 10 year thereafter:- (i) 2 No. High mast of 12 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200 MM, Base plate = 320 x 320 x 20 mm), window at 500 mm from base plate with 8 no. LED energy efficient lamps on each pole. (ii) Supply and installation of 1 no. SS main Gate of SS-304 Grade 3.65m. wide main gate and 1.20m. wide wicket gate (total weight not less than 500 kg) at STP site. (iii) Providing and installing 2 no. centrifugals (1 working + 1 stand by) including centrifuge feed pump, all fittings, instrumentation, electric panel board etc. as per design complete in all respect including packing dry sludge in 20 kg. bag and supplying the same to the market kisan sewa Kendra or as directed by engineer in-charge within lead as pointed at clause 4.4.5 of the NIT, including O & M for 12 months during defect liability period after trail run 3 month and 10 year thereafter. Note: All the infrastructure except construction of boundary wall, path ways / roads, Staff Qurters & Treated effluent carrier from STP to Drain, required to be executed at site to make the MPS / STP functional is included in the scope of work of lump sum job
CCTV CAMERAS Providing and installing 5 CCTV Cameras ( 3 cameras for STP and 2 Cameras for MPS). Complete as per satisfaction of the Engineer-in – charge within 96 hours of signing the arrangement along with 90 days recording (DVR), 32 inch LED Screen, 16 channel DVR at STP site and 8 channel DVR at MPS site with connectors, cables, poles and power supply with online real time output facility. The cameras at both the sites i.e MPS and STP shall be synchronized at STP site. CAMERAS: At STP & MPS Site- 1 no. PTZ speed dome 360 degree 50x zoom camera, 3 no. 12 mm lens size, 1 nos. 3.6mm lens size. MAKE:- Sony/ Canon/ Panasonic/ Samsung. CCTV Cameras should be installed and commissioned before starting execution of work including O & M for 12 months during defect liability period after trail run 3 month and 10 year thereafter
Construction of HT / LT Panel room, MCC panel room, PLC room, Centrifuge house, blower room, laboratory with equipments / furniture, office building, toilet, Lobby including all Sanitary fittings etc. as per drawings covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated alluminium frame of size 100mm x 45mm of 10 gauge for chowkhat, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame with 5mm thick glass AIS/Saint Gobain/ Modi Float Covered Area (400 sqm) including O & M for 12 months during defect liability period after trail run 3 month and 10 year thereafter
Supply, Installation, Testing, Commissioning, Operation and Comprehensive Annual Maintenance of effluent quality monitoring system at 3.00 MLD capacity STP for online (continuous) measurement of PH, Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cables, local data acquisition and display of data on continuous basis for up linking the data to CPCB, HSPCB & PHED, TUV approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents and as contained in scope of work in the notice inviting tender: a) Multi-parameter measuring converter, for connecting up to 18 intelligent sensors Scope including 8 analog inputs/outputs(4 inputs & 4 outputs) (0/4-20Ma), wide- range power supply Optical COD/BOD and TSS probe with spectral processing of the UV-VIS range, for measurement in the outlet/ effluent/ of 2.50 MLD capacity STP with integrated with automatic cleaning.
Bidder Name
Amount
Balbir Singh Contractor
Himmat Singh Contractor
Himmat Singh Contractor
Himmat Singh Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .