| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | ₹7.1 L Quoted ₹7.7 L | L1 | Accepted-AOC aoc |
| 2 | L2₹8.9 L+₹1.3 L (16.3%)Rejected-Finance 0 BELCHAURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 | MAU | UTTAR PRADESH | 275101 | ₹8.9 L+₹1.3 L (16.3%) | L2 | Rejected-Finance L2 |
| 3 | L3₹9.0 L+₹1.3 L (17.0%)Rejected-Finance | ₹9.0 L+₹1.3 L (17.0%) | L3 | Rejected-Finance L3 |
Tender Value
₹9.1 L
EMD Value
₹90,515
Closing Date
17 Dec 2025, 3:00 pmClosed
CHIEF ENGINEER, KMC
Motijheel
Construction of Drain Both side From 128/1016 Y Block Kidwai Nagar To 128/372 Y Block Kidwai Nagar in Ward -66 Zone-2
2025_NNKAN_1095952_1
779/AA-2/24-25
Open Tender
Civil Works
Fixed-rate
45 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹90,515
25 May 2026
4 Dec 2025
17 Dec 2025
4 Dec 2025
17 Dec 2025
4 Dec 2025
Earth work in Excavation in trenches for foundation pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charge with in a distance of 50 mtr.
providing and laying in cement Concrete 1:6:12(1 Cement 6 fine sand and 12 gauge Brick Ballast norminal size 40 mm)and curing comp including cost of form work in foundation and floors etc all comp.
Class-150 Brick work in (1:4) Cement mortar in Foundation & Plinth including supply of all Materials Labour and Tool & Plants etc, required for proper completion of the work.
12mm thick Cement plaster 1;4 in single coat on both side of single or half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not exceeding 80mm in girth and finishied even and smooth.
P/I Cement concrete in 1:1.5:3 (1 Cement:1.5 Coarse Sand:3 Stone aggregate 20mm size etc all comp.
RCC wprl wotj ce,emt cpmcrete 1:1.5:3, 1 Cement :1.5 Coarse Sand :3 Stone Agregate including all completion of.
Mild steel or Iron in Reinforcement inclding all completion of work.
Making of pedastal including all labour work.
Cartage of Earth up to 3 km including all completion of work.
Add 18% G.S.T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.93 MB
BOQ_2017168.xls
BOQ • 0.28 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .